Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026

Aura starts commercial operations for the 49.9 MW Kemble solar project

March 6, 2026

UK solar energy aims to reach 160 GW by 2060, requires ‘whole systems thinking’

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Premier Energies Commissions 1.2 GW Topcon Solar Cell Line in India
Solar Industry

Premier Energies Commissions 1.2 GW Topcon Solar Cell Line in India

solarenergyBy solarenergyJune 27, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Premier Energies has a 1.2 GW tunneloxide -passivated contact (topcon) Solar line in FAB City in Hyderabad, India commissioned, which increases the total cell production capacity to 3.2 GW.

June 27, 2025
Uma Gupta

By PV Magazine India

Premier Energies has commissioned a new 1.2 GW Topcon Solar Cell production line in FAB City, Hyderabad. The facility supplies cell efficiencies above 25% with advanced 16-bus bar architecture that makes a higher power density and energy yield possible under Real-World conditions.

The new line increases the solar cell capacity of Prime Minister from 2 GW to 3.2 GW. The company is currently working on improving its cell production capacity to 8.4 GW and module capacity up to 11.1 GW (from 5.1 GW currently) by June 2026.

“Commissioning of our new Topcon zonnel line marks a crucial step in our innovation trip. With high efficiency and AI-compatible architecture, this technology represents the following jump in the solar performance,” said Chiranjeev Saluja, director and CEO of Premier Energies.

“This commissioning is not only a technological upgrade it is a strategic enabler. This performance seamlessly corresponds to our long-term route map for vertical integration and worldwide competitive capacity,” added Sudhir Reddy, Chief Strategy Officer of Premier Energies. “In particular, 60% of the equipment for this line comes from Europe, which is a reflection of our strategic resilience and dedication to diversifying the most important supply chain of equipment.”

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

See also  RWE contracts solarcycle for recycling dismantled solar panels

Popular content

Source link

cell Commissions Energies India line Premier solar TOPCon
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026

Aura starts commercial operations for the 49.9 MW Kemble solar project

March 6, 2026

UK solar energy aims to reach 160 GW by 2060, requires ‘whole systems thinking’

March 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Talusag starts the production of green ammonia in Iowa – PV Magazine International

By solarenergyFebruary 11, 20250

Landus and Talusag have launched the production of commercial Green Ammonia in Iowa, supported by…

New York Power Authority’s renewable energy plan shows financial challenges to building solar – SPE

December 28, 2025

Ørsted sells European onshore operations to CIP for £1.25 billion

February 5, 2026

Fincantieri to build hydrogen-driven cruise ship-PV Magazine International

April 9, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026

Aura starts commercial operations for the 49.9 MW Kemble solar project

March 6, 2026

UK solar energy aims to reach 160 GW by 2060, requires ‘whole systems thinking’

March 6, 2026

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026
Our Picks

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026

Aura starts commercial operations for the 49.9 MW Kemble solar project

March 6, 2026

UK solar energy aims to reach 160 GW by 2060, requires ‘whole systems thinking’

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.