Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Trinity Services, Common Energy partner for solar projects in the Chicago community

June 9, 2026

Common Energy will build 16 MW of community solar to benefit the Chicago nonprofit

June 9, 2026

Qair reaches financial close on Britain’s first solar PV project

June 9, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Wednesday, June 10
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Tata Power Renewable completes 1 GW DCR compliant PV project for SJVN
Solar Industry

Tata Power Renewable completes 1 GW DCR compliant PV project for SJVN

solarenergyBy solarenergyDecember 30, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Tata Power Renewable Energy Ltd has commissioned a 1 GW solar project for SJVN Ltd. in Rajasthan, India, which supplies green electricity to Rajasthan, Jammu & Kashmir and Uttarakhand. The installation is built in accordance with the Domestic Content Requirements (DCR).

December 30, 2025
Uma Gupta

By pv magazine India

Tata Power Renewable Energy Ltd. (TPREL), a subsidiary of Tata Power, has commissioned SJVN’s 1 GW DCR compliant solar project in Rajasthan. This milestone represents the largest solar project commissioned by TPREL to date and one of the most extensive renewable energy developments in India.

All 2.4 million modules used in the project have been manufactured at TP Solar’s solar cell and module manufacturing facility in Tirunelveli.

The project covers Bandarwala and Karnisar Bhatiyan locations in Bikaner and is designed to provide clean, reliable power across multiple states. The project capacity is allocated to serve key state utilities including 500 MW for Rajasthan Urja Vikas and IT Services Ltd. (RUVITL), 300 MW for Jammu & Kashmir Power Ltd. (JKPL) and 200 MW for Uttarakhand Power Corp. Ltd. (UPCL).

In its first year of operation, the project is expected to generate approximately 2,454.84 million units of green electricity and offset nearly 1.74 million tons of CO₂, significantly contributing to national decarbonization goals.

“The project stands out for its robust engineering and innovative execution, and has been delivered in one of India’s most challenging environments, with temperatures peaking up to 50°C in summer and dropping as low as 3°C in winter, exacerbated by difficult terrain and restricted vehicle movements,” TPREL said. “Despite these limitations, TPREL ensured a timely and safe completion through the deployment of advanced DCR-compatible cells and mono bifacial DCR modules, precision ramming techniques and high-performance inverters designed to operate efficiently under extreme heat.”

See also  Letter from Chinese PV Industry: Tongwei wins 1.17 GW order in Saudi Arabia

With this commissioning, TPREL’s total utility-scale renewable capacity has reached 11.6 GW, including 4.9 GW operated as third-party EPC. Tata Power currently has 5.8 GW of its own capacity operational, of which 4.7 GW is solar energy and 1.1 GW is wind energy. Another 5.8 GW is in various phases of deployment, evenly divided between 3 GW solar and 2.8 GW wind projects, which are expected to be commissioned in phases over the next three to 24 months.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

completes compliant DCR power project renewable SJVN Tata
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Trinity Services, Common Energy partner for solar projects in the Chicago community

June 9, 2026

Qair reaches financial close on Britain’s first solar PV project

June 9, 2026

Avangrid’s Tower Solar achieves interconnection in Oregon | Projects Weekly

June 8, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Sinovoltaics launches free tool for project-specific test scopes for PV modules – SPE

By solarenergyMay 7, 20260

Dutch-German quality assurance company Sinovoltaics has released a free browser-based tool that generates project-specific reliability…

Gore Street Energy Storage Fund Shareholders Call Board Review

July 21, 2025

NEA continues with austerity plan – SPE

June 4, 2024

Power-generating breakwaters for floating photovoltaic solar energy

September 30, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Trinity Services, Common Energy partner for solar projects in the Chicago community

June 9, 2026

Common Energy will build 16 MW of community solar to benefit the Chicago nonprofit

June 9, 2026

Qair reaches financial close on Britain’s first solar PV project

June 9, 2026

Abu Dhabi’s solar self-sufficiency framework marks a shift towards energy intelligence

June 9, 2026
Our Picks

Trinity Services, Common Energy partner for solar projects in the Chicago community

June 9, 2026

Common Energy will build 16 MW of community solar to benefit the Chicago nonprofit

June 9, 2026

Qair reaches financial close on Britain’s first solar PV project

June 9, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.