Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Government grants permission for the 400 MW Zonne -NSIP from Boom Power

May 12, 2025

Battery postponing if the rates in the US to be on hold for 90 days PV Magazine International

May 12, 2025

Chinese problems with solar energy test the Brazilian market in the midst of shifting demand

May 12, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, May 12
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Avada Group wants to build ingot-to-PV module battery factory in India
Solar Industry

Avada Group wants to build ingot-to-PV module battery factory in India

solarenergyBy solarenergyOctober 8, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Avaada will establish a wafer-to-module project to support the company’s existing PV module factory in Dadri. The plant will also produce next-generation batteries and electrolyzers.

October 8, 2024 Uma Gupta

Avaada team at REI India 2024

Image: Avaada Group

By pv magazine India

Indian renewable energy company Avaada Group has laid the foundation stone for its new manufacturing facility, Avaada Electro, at Addl. Butibori Industrial Park in Nagpur, Maharashtra.

The new facility, part of Avaada’s INR 13,650 crore ($1.4 billion) investment, will house a vertically integrated solar manufacturing unit with production from billet wafers to PV cells and modules. It will also produce next-generation batteries and electrolyzers.

Avaada also plans to improve domestic supply chains by establishing support units to ensure timely delivery of PV modules. These units will focus on the production of glass, aluminum frames, junction boxes and other components.

In the first phase, Avaada will set up the wafer-to-module project with a planned capacity of 5 GW for solar cells and 3 GW for modules. These cells will support the company’s existing Dadri module factory, using TOPCon cell technology to ensure the production of high-efficiency cells and modules.

“The project is expected to create more than 5,000 new jobs in various functions. In addition, Avaada is committed to working with local Industrial Training Institutes (ITIs) to support skills development, especially for operators and technicians, to ensure a strong talent pipeline. Avaada also partners with NSDC and NCVET to focus on training, upskilling and reskilling the workforce. Notably, the factory aims to have 60% of its workforce made up of women, a bold step towards building a diverse and inclusive work environment,” Avaada said.

See also  Ministers approve a 200 MW storage location of the battery well in Scotland

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Avada battery build factory Group India ingottoPV module
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Battery postponing if the rates in the US to be on hold for 90 days PV Magazine International

May 12, 2025

Chinese problems with solar energy test the Brazilian market in the midst of shifting demand

May 12, 2025

Tarief uncertainty seizes the development of the American battery – PV Magazine International

May 12, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

US startup offers new metallization pasta for copper cell

By solarenergyApril 28, 20250

Bert Thin Films has developed a copper pasta for the production of solar cells that…

JinkoSolar’s TOPCon modules offer a yield gain of 8.82% in the field test in Japan – SPE

January 22, 2025

Indian startup develops sand-based gravity energy storage system

April 25, 2024

EDF wins Israeli PV tender with bid of $0.019/kWh – SPE

July 12, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Government grants permission for the 400 MW Zonne -NSIP from Boom Power

May 12, 2025

Battery postponing if the rates in the US to be on hold for 90 days PV Magazine International

May 12, 2025

Chinese problems with solar energy test the Brazilian market in the midst of shifting demand

May 12, 2025

Tarief uncertainty seizes the development of the American battery – PV Magazine International

May 12, 2025
Our Picks

Government grants permission for the 400 MW Zonne -NSIP from Boom Power

May 12, 2025

Battery postponing if the rates in the US to be on hold for 90 days PV Magazine International

May 12, 2025

Chinese problems with solar energy test the Brazilian market in the midst of shifting demand

May 12, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.