Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Japan’s oldest PV system is being renovated
Solar Industry

Japan’s oldest PV system is being renovated

solarenergyBy solarenergyOctober 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Tokyo-based startup Girasol Energy and Japan’s Yamanashi Prefecture Enterprise Bureau have re-powered Japan’s oldest PV system, a 100 kW array built in 1993. The project aimed to partially replace the original 13.3% efficient solar panels and provide an alternative to dismantling and recycling the system’s components.

October 15, 2024
Emiliano Bellini

Japanese startup Girasol Energy and the Yamanashi Prefecture Enterprise Bureau have jointly updated the country’s oldest PV system: a 100 kW array deployed in 1993.

The system had a 95 kW inverter and 1,800 solar panels with an energy conversion efficiency of 13.3%, spread over a plot of 751 square meters.

“We redesigned the plant to maximize performance and continue operations by carrying out targeted repairs based on the highly accurate expected energy generation, calculated using simulation technology obtained from big data analysis,” said Girasol Energy. “Instead of completely replacing the solar panels, we mainly rewired the wiring, repaired the components of the communication system and replaced the inverter.”

Girasol Energy said that renovating systems, rather than recycling components, is a practical solution for PV systems whose feed-in tariff will expire in the coming years.

“WWe believe that by quickly identifying defective parts and making accurate repairs, even small and medium-sized power plants that have been installed for years can remain profitable,” the company said.

The companies did not disclose additional technical details about the PV system, which currently powers nearby restaurants and a golf course. The renovation project is part of an initiative by the business office.

“This is the first attempt at this first to aim for 50 years of operation of PV systems,” the company said in a statement. “Repowering a solar power plant does not necessarily mean replacing the entire equipment. We have been able to clearly demonstrate a path to the future where energy generation can be restored by making appropriate redesigns when equipment breaks down or reaches the end of its life.”

See also  India's Alpex Solar targets a capacity of 2.4 GW of PV modules by fiscal year 2026

The companies have developed an Internet of Things (IoT) platform that enables real-time remote monitoring of solar power plants, allowing operators to track data from sensors without additional lines of communication.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Japans oldest renovated system
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Aerocompact introduces tool-free PV mounting system

June 6, 2025

Fraunhofer Isee reveals Micro-CPV module with a cost-reducing design

June 6, 2025

Free Digital Tool Streamlines the Lay -Out Plan for Solar Storses On The Roof

June 5, 2025
Leave A Reply Cancel Reply

Don't Miss
Commercial & Industrial

Floating solar project overlooks skiing capital of Utah

By solarenergyJanuary 15, 20250

The first floating solar project built in Utah is located on a reservoir atop a…

Australian-made vanadium flow battery project could see storage costs of $166/MWh – SPE

November 7, 2024

China announces the purchasing of sodium batteries with price ceiling for $ 150/kWh-PV Magazine International

March 25, 2025

thyssenkrupp nucera sees uncertainties in the medium term – SPE

July 30, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025

‘I wish I had known before that Impostor syndrome is customary’ – PV Magazine International

June 6, 2025
Our Picks

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.