Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Tornado rips through solar park in Florida – SPE
Technology

Tornado rips through solar park in Florida – SPE

solarenergyBy solarenergyOctober 19, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Duke Energy’s Lake Placid solar power plant suffered an EF-2 tornado during Hurricane Milton, shredding an array of solar panels while leaving most of the facility intact.

October 17, 2024
John Fitzgerald Weaver

By pv magazine USA

A tornado ripped through a solar power plant in central Florida. Footage released by Duke Energy shows an array of solar panels being torn from the single-axis trackers holding them in place.

Local weather reports identified the storm as an EF-2 tornado, with winds between 110 and 130 miles per hour. According to the county sheriff’s department, the tornado struck before Hurricane Milton made landfall, also damaging 20 to 30 homes in the area.

The Duke Energy facility was initially developed by EDF Renewables before being sold to Duke Energy, which completed development construction of the factory in 2019. The solar part of the plant has a grid connection capacity of 45 MW, supported by 63.2 MW of solar panels. An 18 MW lithium-ion battery was added to the site in 2022.

Lake Placid Solar Power Plant Image: Duke Energy

The Duke Energy video below shows the tornado’s path through the facility, although the exact direction of the storm is unclear. Damage was limited to the westernmost quadrant of the facility, leaving most of the plant intact and possibly still operational. The tornado’s path extended mainly from north to south, with the storm appearing wider in the northern portion before weakening as it dissipated southward.

Duke Energy reported that Florida issued at least 126 tornado warnings during Hurricane Milton.

According to documents released in 2019, the solar farm cost approximately $60.6 million to build.

See also  BIPV for pilot projects with prefabricated net-zero homes in Australia – SPE

Since Hurricane Andrew in 1992, Florida has consistently strengthened its wind codes and implemented innovations over the decades to make structures better able to withstand high winds. An important change was the increase in wind speed requirements for new construction. The solar farm, located in Highland County, would have had to be structurally designed to withstand wind speeds of up to 150 mph.

Final Wind Speed ​​Report 2023 Source: Source: Florida Building Organization

Several years ago, the U.S. Department of Energy’s National Renewable Energy Laboratory published a report providing guidelines for wind-hardening solar energy systems. The document, Solar photovoltaics in severe weather: cost considerations for storm-hardening PV systems for resilienceoutlines 13 strategies to improve a site’s ability to withstand higher wind speeds, along with the associated costs of these improvements.

In general, single-axis trackers tend to provide less robust support for solar panels compared to fixed rack systems.

Source: NREL report

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Florida park rips solar SPE Tornado
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Utility

DCE Solar designs racks for First Solar Series 7 modules

By solarenergyAugust 8, 20240

DCE solar energya provider of solar mounting solutions, has launched its latest development, the Long…

New 200-KW Solar Project Powers Office Building along San Francisco Embarcadero

August 7, 2025

A British study shows that azimuthal trackers improve the performance of floating PV – SPE

January 2, 2026

RNWBL signs PV recycling partnership with SolarCycle

August 5, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026
Our Picks

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.