Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - BIPV is probably related to the recent fire in the first zero-neutral building in Brussels
Solar Industry

BIPV is probably related to the recent fire in the first zero-neutral building in Brussels

solarenergyBy solarenergyNovember 19, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

At the end of October, a fire broke out in the first energy-neutral building in Brussels, the Treurenberg building. The fire, probably caused by photovoltaic (BIPV) panels integrated into the building on the facade, led to an evacuation, with no injuries reported.

November 19, 2024
Emiliano Bellini

A fire recently broke out in the Treurenberg building in Brussels, probably as a result of solar panels on the structure, according to the Brussels fire brigade.

The seven-storey building, the first energy-neutral building in the Belgian capital, was immediately evacuated and no injuries were reported, according to a statement on the fire brigade’s Facebook account.

“We immediately noticed that the solar panels were on fire,” the statement said. “The inverter is switched off to ensure safe work. We partially dismantled the panels to access the underlying insulation.”

Photos appear to indicate that the fire broke out on the upper facade of the building, which is covered with BIPV panels. The Treurenberg building, designed by Assar Architects and owned by AXA Real Estate Investment Managers, was built in 2016 on behalf of the European Commission.

“So far we cannot give you any further details at this time, as the insurance expertise and the fire brigade report are still pending,” said an AXA Belgium spokesperson. pv magazine, adding that AXA Real Estate Investment Managers and AXA Belgium are separate entities.

The Belgian architectural firm VK architects+engineers, which contributed to the construction of the building, reports on its website that the superstructure is clad with BIPV modules.

“The high-performance building services include cogeneration, architecturally perfectly integrated photovoltaic solar panels and optimally controlled lighting, ventilation and comfort with regard to the atrium,” the company said.

See also  Spanish startup develops BIPV systems for tunnel exits and entrances – SPE

VK architects+engineers and the Brussels fire brigade have not yet responded to requests for additional information.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

BIPV Brussels building Fire related zeroneutral
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Inside PV Manufacturing: Belga Solar’s module factory in Belgium

April 23, 2026

No evidence that PFAS leaks from solar panels, research shows

April 22, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Construction begins on a 12 MW Swiss PV project in the Alps

By solarenergyJanuary 17, 20250

Work has started on the Swiss Madrisa Solar project, a 12 MW alpine PV plant…

Midea Presential Propane Heat Pump – PV Magazine International

March 18, 2025

Direct versus indirect coupling in PV-powered hydrogen generation – SPE

August 21, 2024

US energy storage installations to surpass 2024 total in third quarter of 2025 – SPE

December 18, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.