Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Contracts for difference to be granted on capacity ambition

May 12, 2025

Government grants permission for the 400 MW Zonne -NSIP from Boom Power

May 12, 2025

Battery postponing if the rates in the US to be on hold for 90 days PV Magazine International

May 12, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, May 12
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Lightsource bp drops 300 MW solar project due to public opposition – SPE
Policy

Lightsource bp drops 300 MW solar project due to public opposition – SPE

solarenergyBy solarenergyJanuary 20, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Lightsource bp has abandoned plans for a 300 MW solar project in the US state of Ohio due to opposition from local residents.

January 17, 2025
Ryan Kennedy

By pv magazine USA

Lightsource BP has withdrawn its request appeal to the Ohio Supreme Court on the approval of the planned Birch Solar project. The 300 MW solar facility was opposed by county residents, preventing regulatory approval of the facility.

The solar developer said in a filing that it “has chosen to suspend further development of the solar facility in question.”

Ohio state law has done so eight criteria for approving electricity generation, including environmental impact studies, water conservation, agricultural impact studies, and whether the project serves the “economy and reliability” of the electric system, as well as the “public interest, convenience and necessity.”

After intense public opposition in the Republican county, regulators halted Lightsource bp’s project, saying it was not in the “public interest.”

The solar developer argued that the Ohio Power Siting Board’s view of “public interest” was too narrow and placed too much weight on local opposition, while failing to consider the project’s broader economic and service reliability benefits.

Lightsource bp claimed that the local government and the public had comments “a determining part” of assessing the project’s ability to meet the stated requirements “public interest” requirement. It said this interpretation violated Ohio state law by delegating the Ohio Power Siting Board’s statutory authority to local governments.

To read further, visit our pv magazine USA website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

See also  Norway defines new rules for energy communities – SPE

Popular content

Source link

drops due Lightsource opposition project public solar SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Battery postponing if the rates in the US to be on hold for 90 days PV Magazine International

May 12, 2025

Chinese problems with solar energy test the Brazilian market in the midst of shifting demand

May 12, 2025

Solarpower Europe expands Huawei in the midst of EU bribery probe – PV Magazine International

May 11, 2025
Leave A Reply Cancel Reply

Don't Miss
Technology

French roofing specialist offers self-adhesive solar panels for low-bearing roofs – SPE

By solarenergyJune 6, 20240

France-based Iko launches Iko Excel Solar, a lightweight PV solution for roofs that cannot withstand…

Irish Ress 2 Solar Developments Progress

April 1, 2025

Quantum algorithm for tracking the maximum power of photovoltaics – SPE

August 6, 2024

Enborne Solar Farm obtains building permit

June 2, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Contracts for difference to be granted on capacity ambition

May 12, 2025

Government grants permission for the 400 MW Zonne -NSIP from Boom Power

May 12, 2025

Battery postponing if the rates in the US to be on hold for 90 days PV Magazine International

May 12, 2025

Chinese problems with solar energy test the Brazilian market in the midst of shifting demand

May 12, 2025
Our Picks

Contracts for difference to be granted on capacity ambition

May 12, 2025

Government grants permission for the 400 MW Zonne -NSIP from Boom Power

May 12, 2025

Battery postponing if the rates in the US to be on hold for 90 days PV Magazine International

May 12, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.