Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Myanmar earthquake disrupts the production of solar wanners, global Supply Chain – PV Magazine International
Policy

Myanmar earthquake disrupts the production of solar wanners, global Supply Chain – PV Magazine International

solarenergyBy solarenergyApril 2, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The earthquake of 7.9 Magnitude had consequences for the western regions of China that are good for around 50% of the total production capacity of the country in the Solar Wafer, which means that companies are forced to suspend production.

April 2, 2025
Patrick Jowett

The large-scale earthquake that Central Myanmar struck by the end of March disrupted the global solar supply chain, according to a statement from Jinkosolar.

A spokesperson for the Chinese module manufacturer told PV -Magazine The earthquake of 7.9-magnitude had a “big impact” in the western regions of China, the primary waffle-producing area of ​​the country, which accounts for around 50% of the total wafer-producing capacity.

Large wafer companies have suspended production due to equipment error, added Jinkosolar’s statement, with repairs that are expected to take ‘a few weeks or even months’.

The damage has been the most serious in the province of Yunnan and the prefecture of the Yibin of the province of Sichuan, with reports of errors of equipment such as closures of ovens and explosions that can influence production for a longer period.

This expects an upcoming waffle deficit. According to Jinkosolar, the waffle prices rose nearly 6.7%before the earthquake, with the high season for solar installations that have activated a wave of stock.

“Market analysts emphasize that the disturbances of the earthquake can hinder the continuous efforts to resume the production of wafers,” added Jinkosolar’s statement. “This can further sharpen the offer [and] will probably stimulate prices higher in the short term. “

The Supply Chain is also influenced by a loss of infrastructure. The collapse of the AVA bridge in Myanmar, located between Mandalay and the border of China-Myanmar, has influenced the transport of PV materials, including silver paste and glass. This means that PV modules travel from the Chinese province of Zhejiang to Myanmar will be diverted through alternative ports, which are expected to increase the transport costs by around 15%.

See also  Amea Power will build 1 GW of solar energy and 900 MWh of storage in Egypt – SPE

In the meantime, partial damage to roads in Yunnan and Sichuan has extended the inter-provincial transport times by 20% to 30%.

Jinkosolar’s explanation added that some areas in Yinchuan and Inner Mongolia experience reduced production speeds due to streamline failure and logistics disturbances, which are expected to be recovered within a week.

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

chain disrupts earthquake global International magazine Myanmar production solar supply wanners
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

Golf courses use more land than PV in Germany – SPE

By solarenergyMay 27, 20240

Christian Victor, an X (formerly Twitter) user, has published a new map showing land consumption…

TU Delft unveils liquid encapsulation technology for solar panels

January 26, 2026

Hoymiles launches 5.12 kWh lithium iron phosphate battery for rooftop PV applications – SPE

January 3, 2025

Use of horizontally connected salt caverns for compressed air storage – SPE

December 22, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.