Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Meyer Burger takes 283 solar production workers in Arizona
Solar Industry

Meyer Burger takes 283 solar production workers in Arizona

solarenergyBy solarenergyMay 29, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Meyer Burger started the production of heterojunction (HJT) modules in the United States almost a year ago, but ran into problems less than six months later after a large purchase agreement was terminated.

May 29, 2025
Anne Fischer

By PV Magazine USA

De Meyer Burger -Fabriek near Phoenix, Arizona, has fired 283 production employees and material handlers, as reported by Local news. Meyer Burger was planning to produce 1.4 GW HJT -Zonne -modules in his facility in Arizona.

The closure comes a year after the Swiss solar manufacturer started with production In the United States. However, the first sign of problems came in November when the Shaw Renewable Investments (Desri), one of the largest solar developers in the United States, terminated his main purchase agreement with the manufacturer. The five -year -old deal included The purchase of a maximum of 5 GW of solar modules And played an important role in supporting the new American factory of the manufacturer.

In December 2024, the company signed a new insured person a bridge loan facility that was intended to offer the stability required for restructuring and to re -negotiate an agreement with Desri. Meyer Burger Mentioned in April That it continues to rely on bridge financing to cover its liquidity needs in the short term.

Desri’s deal was ended after Meyer Burger canceled plans To open a 2 GW production cell for solar cells in Colorado and to say that it was no longer financially viable. The company said that continuing to produce solar cells in Germany was the most economic option in current market conditions.

See also  Solar-Windboom based on 2-axis tracking

Meyer Burger was one of the more than 100 new announced solar and storage factories in the United States since the approval of the Inflation Reduction Act. According to the Solar Energy Industries Association (SEIA), since the federal production stimuli were announced investments a total of $ 38.3 billion.

Meyer Burger is not the first to put production shortly after (or even before), it started and it may not be the last. In April, PV Magazine USA reported That Solar4america stopped production in California and South Carolina, where the factory in South Carolina was on stopping even before it started. In response to the reconciliation law that the American house was recently adopted, Abigail Ross Hopper, President and CEO of SEIA, said that The bill threatens the domestic production of production.

In one rack In April, Meyer Burger said that it would postpone the release of his annual report from 15 April to 31 May 2025, stating that “the Going Congress of Meyer Burger is material and depends on important new financing and the successful implementation of his business plans.”

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Arizona Burger Meyer production solar takes workers
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Pennsylvania passes law establishing solar decommissioning plans

July 21, 2026
Leave A Reply Cancel Reply

Don't Miss
Commercial & Industrial

Good Energy and GRYD Energy are teaming up to test a free solar energy portal

By solarenergyNovember 19, 20240

GRYD’s PPA with Good Energy allows it to sell excess solar energy from its network…

Primergy Solar developing 400-MW solar + storage project for California CCA

April 25, 2024

Navien unveils residential air heat pump – SPE

July 10, 2024

Burkina Faso set for 150 MW Solar-Plus-Storage Project-PV Magazine International

July 22, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.