Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Meyer Burger takes 283 solar production workers in Arizona
Solar Industry

Meyer Burger takes 283 solar production workers in Arizona

solarenergyBy solarenergyMay 29, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Meyer Burger started the production of heterojunction (HJT) modules in the United States almost a year ago, but ran into problems less than six months later after a large purchase agreement was terminated.

May 29, 2025
Anne Fischer

By PV Magazine USA

De Meyer Burger -Fabriek near Phoenix, Arizona, has fired 283 production employees and material handlers, as reported by Local news. Meyer Burger was planning to produce 1.4 GW HJT -Zonne -modules in his facility in Arizona.

The closure comes a year after the Swiss solar manufacturer started with production In the United States. However, the first sign of problems came in November when the Shaw Renewable Investments (Desri), one of the largest solar developers in the United States, terminated his main purchase agreement with the manufacturer. The five -year -old deal included The purchase of a maximum of 5 GW of solar modules And played an important role in supporting the new American factory of the manufacturer.

In December 2024, the company signed a new insured person a bridge loan facility that was intended to offer the stability required for restructuring and to re -negotiate an agreement with Desri. Meyer Burger Mentioned in April That it continues to rely on bridge financing to cover its liquidity needs in the short term.

Desri’s deal was ended after Meyer Burger canceled plans To open a 2 GW production cell for solar cells in Colorado and to say that it was no longer financially viable. The company said that continuing to produce solar cells in Germany was the most economic option in current market conditions.

See also  Greetings Risk remains the top issue that confronts solar projects

Meyer Burger was one of the more than 100 new announced solar and storage factories in the United States since the approval of the Inflation Reduction Act. According to the Solar Energy Industries Association (SEIA), since the federal production stimuli were announced investments a total of $ 38.3 billion.

Meyer Burger is not the first to put production shortly after (or even before), it started and it may not be the last. In April, PV Magazine USA reported That Solar4america stopped production in California and South Carolina, where the factory in South Carolina was on stopping even before it started. In response to the reconciliation law that the American house was recently adopted, Abigail Ross Hopper, President and CEO of SEIA, said that The bill threatens the domestic production of production.

In one rack In April, Meyer Burger said that it would postpone the release of his annual report from 15 April to 31 May 2025, stating that “the Going Congress of Meyer Burger is material and depends on important new financing and the successful implementation of his business plans.”

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Arizona Burger Meyer production solar takes workers
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Fotowatio Renewable Ventures deploys 300 MW of solar power in Australia

By solarenergyNovember 26, 20240

Fotowatio Renewable Ventures (FRV) says its 300MW Walla Walla Solar Farm in New South Wales,…

Japan sees a bright future for Ultradunne, flexible solar panels

July 22, 2025

NextPower UK touches £ 733 million in the conclusion of fundraising

March 11, 2025

Trinasolar Evergreen unveils BIPV products for industrial, public use

October 28, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.