Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - 83% of modules manufacturers had one test error in the latest Kiwa Pvel scorkaart
News

83% of modules manufacturers had one test error in the latest Kiwa Pvel scorkaart

solarenergyBy solarenergyJune 8, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Test Lab Kiwa Pel has published his 11th annual PV -module Reliability Scorecard. This digital resource offers stakeholders in the solar industry of test insights obtained from the flagship product qualification program of Kiwa Pvel (PQP). The PQP is an extensive series of extensive reliability and performance tests that evaluate solar modules under a wide range of environmental and mechanical conditions – including the effects of extreme temperatures and high humidity, as well as the effects of mechanical stress, hail and ultraviolet light.

Kiwa Pel

In the 11th edition, Kiwa Pvel mentions a total of 50 manufacturers as “top artists” in one or more of the tests, with nine manufacturers mentioned as top performers with at least one model type mentioned in each of the seven test categories.

Other important highlights of the Scorecard 2025 include:

  • Only 21 model types achieved the topper status in all reliability tests (thermal bicycles, moisture heat, mechanical stress sequence, hail voltage inspection, potential induced breakdown and slightly induced demolition + Letid), and only three models were also in pan.
  • There are mixed results in PQP tests, with some improvement and other trending down. The PID and PAN results improved, but the fracture speed of the MSS and HSS module has increased. Similarly, the UVID results are starting to improve, but for some people are still a source of care.
  • 83% of the module manufacturers had at least one test failure, an increase of 66% reported in the 2024 score card, which at the time had been reported the highest percentage ever.
See also  Wavelabs unveils solar simulator for perovskite mini modules – SPE

“The rapid pace of innovation in the landscape of the PV module is encouraging and it is great to see more products that reach the status of the top performance,” said Tristan Erion-Lorico, VP of Sales and Marketing at Kiwa PVL. “However, we continue to warn that buyers do not assume that not all modules have been created. Our tests remain considerable variability in performance and reliability in the long term. The score card remains an essential tool for navigating these differences, making purchasing teams smart, risky decisions.”

The complete 2025 PV module reliability scorecard is available online at scorecard.pvel.com. With the help of the Top Performers -Tool, users can explore detailed test results, filter by manufacturer, moduletype and test category and download custom search results for further analysis.

“Our Scorecard 2025 reveals both the progress and the challenges associated with a dynamic PV modulem market,” said Kevin Gibson, managing director of Kiwa Pvel. “For more than ten years, we have tested rigorous modules to reveal reliability and performance trends, and this year was no exception. Although not every test result exceeded our expectations, many – who demonstrate resilience and excellence in an evolving industry.”

In order to be eligible for the 2025 score card, manufacturers must have completed the PQP monster production factorys after 1 October 2023 and at least two factory witness PV modula monsters submitted to all PQP confrontability tests, according to the BOM test requirements of Kiwa Pvel.

News item from Kiwa Pvel

Source link

See also  Citing the recent surge in imports, US solar panel manufacturers are calling on the government for immediate assistance
error Kiwa latest manufacturers modules PVEL scorkaart test
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

China’s polysilicon is hitting a cost floor as manufacturers curtail production due to weak demand

April 18, 2026

Switzerland will fund research into recycling PV modules, batteries and heat pumps – SPE

April 18, 2026

Will we finally buy European PV modules?

April 17, 2026
Leave A Reply Cancel Reply

Don't Miss
News

The world’s first gigawatt-scale offshore solar project is underway

By solarenergyNovember 17, 20240

The world’s first gigawatt-scale offshore solar project is underway The world’s first gigawatt-scale offshore solar…

Speed ​​is the new energy subsidy

October 27, 2025

Fimer will announce a buyer – SPE – by the end of the year

June 21, 2024

SoftBank refines PV battery technology for high altitudes – SPE

October 25, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026

Zendure launches battery ranges for residential PV – SPE

April 23, 2026
Our Picks

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.