Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Premier Energies Committees 1.2 GW Topcon Solar Cell Line
Solar Industry

Premier Energies Committees 1.2 GW Topcon Solar Cell Line

solarenergyBy solarenergyJuly 1, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The new line increases the solar cell capacity of Premier Energies from 2 GW to 3.2 GW. The Indian manufacturer is on schedule to scale this up to 8.4 GW by June 2026.

June 30, 2025
Uma Gupta

The new Premier Energies production line

Image: Premier Energies

By PV Magazine India

Premier Energies has commissioned a new 1.2 GW Topcon Solar Cell production line in FAB City, Hyderabad. The facility supplies cell efficiencies above 25% with advanced 16-bus bar architecture that makes a higher power density and energy yield possible under Real-World conditions.

The new line increases the solar cell capacity of Prime Minister from 2 GW to 3.2 GW. The company is currently working on improving its cell production capacity up to 8.4 GW and module capacity up to 11.1 GW, from 5.1 GW currently, by June 2026.

“Commissioning of our new Topcon zonnel line marks a crucial step in our innovation trip. With high efficiency and AI-compatible architecture, this technology represents the following jump in the solar performance,” said Chiranjeev Saluja, director and CEO of Premier Energies.

“This commissioning is not only a technological upgrade it is a strategic enabler. This performance seamlessly corresponds to our long-term route map for vertical integration and worldwide competitive capacity,” added Sudhir Reddy, Chief Strategy Officer of Premier Energies. “In particular, 60% of the equipment for this line comes from Europe, which is a reflection of our strategic resilience and dedication to diversifying the most important supply chain of equipment.”

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

See also  US Panel Price spread distributes between India and Indonesia/Laos Origin

Popular content

Source link

cell committees Energies line Premier solar TOPCon
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Pennsylvania passes law establishing solar decommissioning plans

July 21, 2026
Leave A Reply Cancel Reply

Don't Miss
Carbon Credit

ACCU price in focus as Rio plots the future of biofuels

By solarenergyJune 23, 20240

Rio Tinto has urged the federal government to make crops grown for biofuel production eligible…

Solar energy, off-grid systems are key to Cameroon’s electrification – SPE

October 20, 2025

Trimble Boosts Automaton on Vermeer Pile Drivers to optimize solar jobs

September 30, 2025

German startup unveils ‘self-aligning’ TOPCon solar cell with back contact

October 1, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.