Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - PowerChina launches 31 GW solar procurement – ​​SPE
Policy

PowerChina launches 31 GW solar procurement – ​​SPE

solarenergyBy solarenergyDecember 15, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

China Power Construction Corp. (PowerChina) has launched a 31 GW solar module tender for 2026 projects across n-type tunnel oxide passivated contact (TOPCon), heterojunction (HJT) and back-contact (BC) technologies as part of a broader 97 GW renewable energy and grid equipment program.

December 15, 2025
Vincent Shaw

PowerChina has launched its 2026 centralized equipment procurement program, launching tenders for 97 GW of renewable energy and network equipment to ensure supply chain stability through framework agreements. The program includes 35 GW of wind turbines, 31 GW of solar panels and 31 GW of solar inverters for projects before 2026, with bids due by December 24, 2025. The tender for solar modules is split into n-type TOPCon of 24 GW, HJT of 3 GW and BC technologies of 4 GW, all of which have bifacial compatibility and cell sizes of 182 millimeters and more require. The inverter tender covers integrated cabinet inverters of more than 3,125 MW at 8 GW, string inverters of more than 300 kW at 20 GW and smaller string inverters from 10 kW to 150 kW at 3 GW. PowerChina said the procurement will be conducted through framework shortlisting, with suppliers selected through secondary competitive processes.

Three Gorges Group has released the results of its 2026 solar procurement, with six module suppliers selected for a 2.5 GW tender, including JinkoSolar, Tongwei, Longi, Astronergy and JA Solar, with bid prices ranging from CNY0.75 ($0.11)/W to CNY0.763/W. In a related tender of 3 GW inverters, shortlisted suppliers for string inverters from 300 kW to 400 kW include Sungrow, Chungwang Xinyun Intelligent Technology, Zhuzhou Converters National Engineering Research Center, Sungrow Electric and Xiamen Kehua Digital Energy Technology.

See also  The world's largest foldable PV roof system comes online in Switzerland – SPE

Long has terminated its planned global share certificate issuance and Swiss listing after the 2022 proposal approval period expired. The plan, approved by the board and shareholders, targeted revenues of nearly CNY 20 billion, equivalent to $2.75 billion. Longi said external market changes and lapses in regulatory approvals led to the global certificate plan being halted after consultation with advisors.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

launches PowerChina Procurement solar SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

European Solar Manufacturing Council is not using Ja Solar Modules at Borussia Dortmund

By solarenergyApril 4, 20250

The European Solar Manufacturing Council (ESMC) has criticized the decision of Borussia Dortmund to install…

New dimensions approach for PV, battery storage in Smart Homes – PV Magazine International

July 4, 2025

At-risk youth win international sustainability competition with off-grid home

August 8, 2024

Test error on a 100 MW battery disrupts the power connection between Estonia and Finland – SPE

January 30, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.