Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Commercial & Industrial - Allye Energy’s MAX300 has been upgraded for charging at the 400 kW depot
Commercial & Industrial

Allye Energy’s MAX300 has been upgraded for charging at the 400 kW depot

solarenergyBy solarenergyMay 15, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

UK mobile battery storage company Allye Energy has upgraded its MAX300 product for fleet operators electrifying their depots.

The MAX300 battery energy storage system (BESS) offers up to 300 kWh, thanks to the integration of 800V battery architecture. Allye uses waste EV batteries in its storage systems and says 800V is now the leading voltage standard used in most advanced EV platforms.

Higher voltage batteries allow the portable BESS to support DC charging up to 400 kW. According to the company, that also offers higher capacity stationary storage Powered by recycled EV batteries, MAX300 means fleet operators can upgrade their depot charging facilities without the cost and delay of network upgrades.

The use of BESS to maximize a location’s capacity is becoming increasingly common in electric vehicle charging. BloombergNEFs Energy storage outlook H1 2026 The report showed that the BESS capacity combined with electric vehicle charging in China, France, US and UK has reached almost 1 GWhwhile China is expected to deploy more than 10 GWh more.

Related:Elements Green acquires a 300MW/600MWh Scottish BESS project from Geocore

It can enable faster or smaller grid connections, it better enables on-site self-consumption of solar energy, and charging patterns can be optimized to take advantage of price signals or ancillary service markets.

Robert Carter, CTO at Allye Energy, says: “A fleet operator doesn’t have to wait months for an upgrade to the electricity grid before they can charge their vehicles. With the MAX300, that no longer has to be done. Connect it to an existing connection and you immediately have up to 400 kW DC fast charging at your disposal.

See also  Beryl receives funding for the solar e-bike charging project

“You can also charge this system on the go via a public DC fast charger. The engineering behind it is really complex – the operator experience is truly simple. With over 300 kWh of storage, the system continues to run long after competing systems run out of power. And when no vehicles are charging, that same storage capacity monetizes network services. It’s a fundamentally different proposition than anything else on the market.”

The trailer-mounted BESS also features a DC-to-DC architecture that integrates Allye’s fast DC charging system with minimal energy loss in transmission. It is available in both CCS and NACS standards and supports voltages from 200 V to 1,000 V; these specifications include all EV charging formats currently on the market.

According to the company, the “remarkable” price for the system, at £99,000 (US$126,610), is equivalent to the cost of some standalone DC fast charging systems, which come with the additional cost of the required grid connection.

Related:Aurora’s new battery intelligence platform shows GB BESS assets doubled sales in March



Source link

Allye charging Depot Energys MAX300 upgraded
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

Prime Minister reduces VAT on electricity, appoints new energy secretary

July 21, 2026

Financial close of Fidra Energy’s 500MW battery energy storage

July 20, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Green hydrogen remains ‘priceless’ duration in Africa – PV Magazine International

By solarenergyJune 13, 20250

A European research team has assessed the level of hydrogen in 31 African countries and…

Hungarian startup offers PCM-based thermal battery with an energy density of 30 kWh/m3 – SPE

July 10, 2024

As headwinds prevail, geopolitics drives North American solar PPA prices higher in Q1 – SPE

April 22, 2026

Waaree Energies starts production of solar panels in India – SPE

November 18, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.