Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Utility - Virginia solar project using Nevados trackers receives an environmental award from the state
Utility

Virginia solar project using Nevados trackers receives an environmental award from the state

solarenergyBy solarenergyApril 28, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The recently commissioned 170 MWDC The Bartonsville Energy Facility solar project has been praised by Virignia’s Department of Environmental Quality (DEQ) as a model of environmental stewardship. This array was able to avoid environmentally disruptive grading of rural areas and use less steel at the structural level Nevados‘ All Terrain Tracker, a single-axis solar tracker.

Terrain-tracking solar trackers await commissioning at the Bartonsville Energy Facility, a 170 MW solar farm near Winchester, Virginia. Nevados

The Governor’s Environmental Excellence Awards, an annual program administered by the DEQ in partnership with the Department of Conservation and Recreation, has recognized Bartonsville Energy Facility partners – MYR Energy Services, DE Shaw Renewable Investments (DESRI) and Nevados – as Gold medalists in the Environmental and Sustainable Projects Category.

This award recognizes initiatives that exceed regulatory requirements to improve the environment and promote sustainability. The Nevados All Terrain Tracker features adaptive pivoting bearings that allow it to track existing terrain over slope changes of up to 26% on any foundation. It is designed to eliminate or reduce the need for grading, simplify stormwater management and reduce the scope of permits. To date, Nevados has successfully completed all of its projects without requiring any review for the trackers, the company said in a press release.

“Our All Terrain Tracker represents a significant advancement in solar energy development, allowing us to use solar energy without disrupting the natural landscape,” said Yezin Taha, CEO of Nevados. “By adapting to the terrain, our technology eliminates the need for grading, preserving the land.”

See also  Nevados overhauls the latest All Terrain Tracker in time for RE+

The Bartonsville Energy Facility is located in the northern tip of Virginia, near Winchester. An independent analysis by civil consultancy Sierra Overhead Analytics reported that the Nevados All Terrain Tracker eliminated the need to move more than 400,000 cubic meters of soil there, equivalent to 123 Olympic-sized swimming pools. The avoided earthmoving and steel saved the Bartonsville project about $2.5 million each, for a combined savings of $5 million, according to Nevados.

News item from Nevados

Source link

award Environmental Nevados project Receives solar state trackers Virginia
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025
Leave A Reply Cancel Reply

Don't Miss
Policy

French solar panel manufacturer Recom Sillia is being liquidated – SPE

By solarenergyMay 10, 20240

The company operated a module manufacturing facility in Lannion, Brittany, northern France. It had filed…

First Solar completes construction of a 1.3 million square foot R&D center

July 18, 2024

Community Solar will reach 14 GW by 2029, says Wood Mackenzie

August 14, 2024

New PV additions in Brazil reached 6 GW in the January-April period – SPE

May 29, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025
Our Picks

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.