Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - New research shows that India has 207 GW of floating solar potential
Solar Industry

New research shows that India has 207 GW of floating solar potential

solarenergyBy solarenergyMay 10, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

A new report prepared under the Indo-German Technical Cooperation for Innovative Solar Energy provides a comprehensive overview of India’s floating solar potential. It also provides projections for installations from 2024 to 2040.

May 10, 2024 Uma Gupta

By pv magazine India

A new report prepared under the Indo-German Technical Cooperation for Innovative Solar Energy (IN Solar) shows that water bodies in interior India have the technical potential to host 206.7 GWp of floating solar capacity.

The team used GIS-based data for all water bodies in India (calculated in square kilometres) by referring to the European Commission’s Copernicus programme.

The dataset was filtered to include water bodies with a usable area of ​​more than 0.015 square kilometers, with a water availability of 12 months, while water bodies in protected areas were excluded. To install 1 MW of floating PV, an area of ​​0.015 square kilometers is required.

The project was launched under the guidance of the Indian Ministry of New and Renewable Energy and is funded by the Deutsche Gesellschaft für Internationale Zusammenarbeit GmbH (GIZ). Ernst and Young LLP (EY LLP) led the project, together with CSTEP and Fraunhofer ISE as partners.

In a moderate scenario, the report said India could install 30 GW of cumulative floating solar capacity between 2024 and 2040. They assumed that 1 MW of floating solar would require capital expenditure worth a levelized cost of energy (LCOE) of INR 4.32 ($0.052)/kWh.

The research team assumed an annual reduction in capital investments of 2.5%, resulting in a gradual decline in the LCOE of floating PV installations, starting in 2024 and continuing until 2040. The LCOE is expected to decline to INR 3.72 /kWh in 2030 and INR 2.90. /kWh by 2040.

See also  New Jersey is expanding Community Solar Program with 250 MW

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Source link

floating India potential Research shows solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Technology

The case for combining pump-hydro storage with Floating PV-PV Magazine International

By solarenergyJanuary 25, 20250

Researchers in Italy have analyzed the techno-economic viability to improve three pumped hydro plants in…

Fortress Power Releases Releases 9.6-KWh Ephorce Residential Battery

March 10, 2025

Find better photovoltaic materials faster with AI

January 25, 2025

University of Michigan develops efficient system for converting CO2 into ethylene

September 21, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.