Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Utility - Bechtel completes the Cutlass Solar 2 project in Texas using automation, robots and drones
Utility

Bechtel completes the Cutlass Solar 2 project in Texas using automation, robots and drones

solarenergyBy solarenergyMay 22, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Cutlass Solar 2 project in Fort Bend, Texas, has been completed and is generating electricity at full capacity. Bechtel built the 218 MW project, which is owned and operated by Sabanci Climate Technologies.

“We are excited to get Cutlass Solar 2 up to maximum capacity to deliver more renewable energy to Texans, support America’s energy transition and help achieve the Lone Star State’s goal of becoming the nation’s largest producer of solar energy ,” said Scott Austin, Bechtel General Manager of Renewable Energy and Clean Energy. “Bechtel is proud to partner with Sabanci Climate Technologies in their efforts to make clean, renewable energy more accessible to the people of Texas.”

“We partnered with Bechtel for our first solar venture because they are experts in delivering projects better and faster,” said Ismail Bilgin, president of Sabanci Climate Technologies. “Sending maximum power to the Texas grid is a fantastic milestone in this successful project and reaffirms that we were right to choose Bechtel. We look forward to continuing this success together on our next project, Oriana.”

To meet the project’s ambitious thirteen-month schedule, Bechtel leveraged data-driven automation, research robots, machine-driven equipment, drones, and an “every minute matters” mentality. Bechtel’s digital fulfillment hub used at Cutlass Solar 2 enabled 100% digital delivery through software integration. The hub collects data directly from equipment in the field and feeds the data into an interactive, map-based visualization. You can watch a video about Bechtel’s smart digital delivery at Cutlass projects here.

At the height of construction work, more than 300 people worked on the site. About 30% of the project’s professional staff and 15% of craft professionals were women, representing two and a half times the industry average.

See also  Acoustics for Solar Harmony - PV Magazine International

Bechtel will soon begin construction on the 232 MW Oriana Solar facility for Sabanci Climate Technologies in Victoria County, Texas.

News item from Bechtel

Source link

automation Bechtel completes Cutlass drones project robots solar Texas
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026

ComEd starts a new energy pilot with a solar rebate on the roof of a brewery

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

California landslide victims get emergency solar and solar energy storage

By solarenergyDecember 31, 20240

By Charles W. Thurston November 21, 2024 A growing number of the 350 victims of…

AI platform draws up data about the renewable energy projects of Spain – PV Magazine International

September 26, 2025

The German Tesvolt starts with energy trade at pooled commercial batteries – PV Magazine International

February 6, 2025

Solar Energy UK launches a career initiative at Skills Hub in London

March 12, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.