Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Utility - Bechtel completes the Cutlass Solar 2 project in Texas using automation, robots and drones
Utility

Bechtel completes the Cutlass Solar 2 project in Texas using automation, robots and drones

solarenergyBy solarenergyMay 22, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Cutlass Solar 2 project in Fort Bend, Texas, has been completed and is generating electricity at full capacity. Bechtel built the 218 MW project, which is owned and operated by Sabanci Climate Technologies.

“We are excited to get Cutlass Solar 2 up to maximum capacity to deliver more renewable energy to Texans, support America’s energy transition and help achieve the Lone Star State’s goal of becoming the nation’s largest producer of solar energy ,” said Scott Austin, Bechtel General Manager of Renewable Energy and Clean Energy. “Bechtel is proud to partner with Sabanci Climate Technologies in their efforts to make clean, renewable energy more accessible to the people of Texas.”

“We partnered with Bechtel for our first solar venture because they are experts in delivering projects better and faster,” said Ismail Bilgin, president of Sabanci Climate Technologies. “Sending maximum power to the Texas grid is a fantastic milestone in this successful project and reaffirms that we were right to choose Bechtel. We look forward to continuing this success together on our next project, Oriana.”

To meet the project’s ambitious thirteen-month schedule, Bechtel leveraged data-driven automation, research robots, machine-driven equipment, drones, and an “every minute matters” mentality. Bechtel’s digital fulfillment hub used at Cutlass Solar 2 enabled 100% digital delivery through software integration. The hub collects data directly from equipment in the field and feeds the data into an interactive, map-based visualization. You can watch a video about Bechtel’s smart digital delivery at Cutlass projects here.

At the height of construction work, more than 300 people worked on the site. About 30% of the project’s professional staff and 15% of craft professionals were women, representing two and a half times the industry average.

See also  Lightsource BP Energie from the Texas Solar Port Folio

Bechtel will soon begin construction on the 232 MW Oriana Solar facility for Sabanci Climate Technologies in Victoria County, Texas.

News item from Bechtel

Source link

automation Bechtel completes Cutlass drones project robots solar Texas
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Chinese PV industry Letter: Solar Stocks Slide while American rates provide care

By solarenergyApril 9, 20250

Chinese solar shares tumbled on 7 April after the US government had announced new rates,…

Iberdrola plans 1.32 GW Pumped-Hydro Storage project in Portugal-PV Magazine International

July 14, 2025

Gore Street operational capacity increased by 45%

May 23, 2024

DESRI is breaking ground on a 130 MW solar and storage project in New Mexico

August 19, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026
Our Picks

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.