Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Panhandle Power Solutions: EPC for battery energy storage system
Solar Industry

Panhandle Power Solutions: EPC for battery energy storage system

solarenergyBy solarenergyJune 3, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Panhandle Power Solutions (PPS) will serve as EPC for a new battery energy storage system for Whetstone power, a developer of sustainable energy infrastructure. The contract underlines PPS’s commitment to providing specialist full-spectrum EPC services that support the energy transition for its commercial customers.

The Colorado-based 202.2 MWh battery energy storage system will demonstrate state-of-the-art technologies that will help reduce peak loads for a local electric utility. It marks a major milestone in the state’s sustainable energy infrastructure and, once completed, will play an important role in increasing the resiliency of the electric grid and optimizing energy resources.

“It is with great excitement that PPS has been entrusted by Whetstone Power as the EPC for this project,” said Robin Hurst, VP of Renewable Energy at PPS. “We are a resourceful and resilient organization committed to the highest standards in engineering, procurement and construction. The PPS team is excited to bring this commitment, as well as our commitment to safety and environmental standards, to this project. Over the next six months, we look forward to meeting our customer’s needs and deploying this clean energy project in Colorado.”

Panhandle Power Solutions has just broken ground on the project, which is expected to be completed by October 1. To date, the company has deployed more than 1.5 GW of distributed generation and utility-scale clean energy projects in the United States.

PPS is a wholly owned subsidiary of Bristol Bay Native Corporation (BBNC), an Alaskan Native Corporation. With offices in Washington, DC and Northwest Florida, PPS was founded in 2008 and served as the federal contractor providing general construction and electrical services to the nation’s most critical defense facilities. The company was acquired by BBNC in 2019 and has expanded to serve utility- and investment-grade commercial customers in the renewable energy sector while maintaining the legacy of its federal roots. In 2023, PPS joined BBNC’s industrial group, Bristol Bay Industrial (BBI). As a BBI member company, PPP adds to BBI’s already robust electrical capabilities.

See also  Powering homes with PVT energy, Stirling engines, battery storage

Listen to more in-depth conversations on Solar Builder’s YouTube channel

Our most popular series include:

Power forward! | A collaboration with BayWa re to discuss industrial topics at a higher level.
The buzz | Where we give our 2 cents per kWh in the residential solar market.
The pitch | Discussions with solar manufacturers about their new technology and ideas.


Source link
battery Energy EPC Panhandle power solutions storage system
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026

Zendure launches battery ranges for residential PV – SPE

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Commercial & Industrial

520 KWP Solar installation completed on roof panal roof

By solarenergyFebruary 4, 20250

Absolar, which specializes in commercial solar installation, designed and mounted the panels around 700 skylights…

Essential tips for Colorado Springs

December 16, 2024

Carrier introduces residential R32 air-to-water heat pump-PV Magazine International

March 10, 2025

China files WTO complaint against Indian solar energy subsidies

December 22, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Our Picks

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.