Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Panhandle Power Solutions: EPC for battery energy storage system
Solar Industry

Panhandle Power Solutions: EPC for battery energy storage system

solarenergyBy solarenergyJune 3, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Panhandle Power Solutions (PPS) will serve as EPC for a new battery energy storage system for Whetstone power, a developer of sustainable energy infrastructure. The contract underlines PPS’s commitment to providing specialist full-spectrum EPC services that support the energy transition for its commercial customers.

The Colorado-based 202.2 MWh battery energy storage system will demonstrate state-of-the-art technologies that will help reduce peak loads for a local electric utility. It marks a major milestone in the state’s sustainable energy infrastructure and, once completed, will play an important role in increasing the resiliency of the electric grid and optimizing energy resources.

“It is with great excitement that PPS has been entrusted by Whetstone Power as the EPC for this project,” said Robin Hurst, VP of Renewable Energy at PPS. “We are a resourceful and resilient organization committed to the highest standards in engineering, procurement and construction. The PPS team is excited to bring this commitment, as well as our commitment to safety and environmental standards, to this project. Over the next six months, we look forward to meeting our customer’s needs and deploying this clean energy project in Colorado.”

Panhandle Power Solutions has just broken ground on the project, which is expected to be completed by October 1. To date, the company has deployed more than 1.5 GW of distributed generation and utility-scale clean energy projects in the United States.

PPS is a wholly owned subsidiary of Bristol Bay Native Corporation (BBNC), an Alaskan Native Corporation. With offices in Washington, DC and Northwest Florida, PPS was founded in 2008 and served as the federal contractor providing general construction and electrical services to the nation’s most critical defense facilities. The company was acquired by BBNC in 2019 and has expanded to serve utility- and investment-grade commercial customers in the renewable energy sector while maintaining the legacy of its federal roots. In 2023, PPS joined BBNC’s industrial group, Bristol Bay Industrial (BBI). As a BBI member company, PPP adds to BBI’s already robust electrical capabilities.

See also  India sets a new record with 17.4 GW of solar energy in the first nine months of 2024

Listen to more in-depth conversations on Solar Builder’s YouTube channel

Our most popular series include:

Power forward! | A collaboration with BayWa re to discuss industrial topics at a higher level.
The buzz | Where we give our 2 cents per kWh in the residential solar market.
The pitch | Discussions with solar manufacturers about their new technology and ideas.


Source link
battery Energy EPC Panhandle power solutions storage system
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026

UK solar energy aims to reach 160 GW by 2060, requires ‘whole systems thinking’

March 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

VoltStorage improves its iron-salt battery technology – SPE

By solarenergyJuly 25, 20240

German flow battery company VoltStorage says the next phase of technology development will deliver a…

India to add 11.3 GW of solar panel capacity, 2 GW of cells in first half of 2024

October 9, 2024

Pioneering discovery links a small polaron effect to improved spin -lifetime in 2D -shedhalogide perovskites

March 15, 2025

Indian scientists design lead-free perovskite solar cell with an efficiency of 23.61% – SPE

May 14, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026
Our Picks

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.