Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - 1-GWDC Gemini Solar + Storage project now connected to the US grid
News

1-GWDC Gemini Solar + Storage project now connected to the US grid

solarenergyBy solarenergyJuly 18, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The largest solar and storage project in the United States is now connected to the grid. The Gemini Solar + Storage Projectbuilt by Primergy Solar and Quinbrook Infrastructure Partners, will provide power to Las Vegas and other Nevada and Southwest communities.

Credit: Primergy

“Gemini broke the mold with historic solar and BESS, backed by the largest tax financing of its kind,” said Ty Daul, CEO of Primergy. “Reaching full commercial operations marks an important technical and financial milestone for our team. We successfully addressed the challenging supply chain and inflation issues through proactive planning and collaboration to bring this project online. We are grateful to our partners and investors for their commitment and shared vision in delivering clean energy to the Western US.”

Gemini’s 1.8 million solar panels can generate up to 690 MWAC (966-MWDC), which supplies approximately 10% of Nevada’s peak power demand. The solar panels are combined with 380 MW of 4-hour battery storage, for approximately 1,400 MWh of reliable power after sunset. The project’s unique DC-coupled storage configuration allows the BESS to be charged directly from the solar panels, resulting in increased efficiency and maximizing solar energy capture and storage directly on site. It was reported that the project used Maxeon solar panels.

To minimize environmental impact, Primergy has taken measures to leave vegetation in place, installed solar panels to follow the natural contours of the ground and reduced the project’s land footprint by more than 20% by through a well-thought-out design. In addition, the project created approximately 1,300 union and prevailing wage jobs and contributed approximately $463 million to Nevada’s economy.

See also  Entergy and NextEra Energy Resources enter into agreement for up to 4.5 GW of new solar + storage

“Gemini is creating a blueprint for the holistic and innovative development of clean energy on a mega-scale, and we are proud to have brought this landmark project to life and delivered so many positive impacts in terms of job creation, environmental stewardship and community engagement the local community,” said David Scaysbrook, co-founder and managing partner of Quinbrook. “Quinbrook and Primergy have worked as one team to diligently meet the inevitable challenges of bringing one of the largest solar and storage projects ever online. It is a testament to the hard work and creativity of our teams – along with our many best-in-class partners – that Gemini is now playing a meaningful role in delivering clean, affordable energy to the people of Las Vegas.”

News item from Primergy

Source link

1GWDC connected Gemini grid project solar storage
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Leave A Reply Cancel Reply

Don't Miss
Technology

TCL launches Propane Heat Pump for Residential Applications – PV Magazine International

By solarenergyMarch 11, 20250

The Chinese solar manufacturer entered the heat pump business with a new product that is…

U.S. solar prices are doubling European costs amid regulatory challenges

May 23, 2024

Burns & McDonnell to EPC two solar projects in Iowa for Alliant Energy

May 2, 2024

Growatt brings all-in-one 8 kWh balcony storage system from-PV Magazine International

March 11, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.