Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Enviromena’s 48.9MW solar farm is refused by Warwickshire Council
News

Enviromena’s 48.9MW solar farm is refused by Warwickshire Council

solarenergyBy solarenergyJuly 19, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The proposed site for Enviromena’s 48.9 MW solar farm was rejected despite being recommended for approval. Image: Enviromena.

Despite being recommended for approval by the planning officer, North Warwickshire Borough Council committee members voted against the 150-acre solar farm set up for development on a site near the M6 ​​at Fillongley.

The decision, taken on July 8, came on the day Rachel Reeves, Labor chancellor, pledged to “rebuild Britain”.

Reeves had criticized a “status quo that responds to the existence of compromises by always saying “no,” with too many construction projects being rejected due to local conflicts. Yesterday, July 17, the King’s Speech built on the proposal to plan reforms as a major boost to the British economy.

According to the speech: “Ministers will get Britain building, including through planning reforms, as they look to accelerate the delivery of quality infrastructure and housing.”

The Planning and Infrastructure Bill promises to provide more resources to hire the 300 new planners. Labor says this will help speed up approvals for new homes. It will also, crucially for the development of renewable energy projects, simplify the consent process for major infrastructure projects.

Kicking off his premiership as secretary of state for energy security and net zero, Ed Miliband granted development consent orders (DCOs) for three nationally important infrastructure projects (NSIPs), two of which had been postponed under the Conservative government.

North Warwickshire Borough Council is led by a Conservative minority administration and has rejected the project on the grounds that it is an inappropriate development in the Green Belt and would cause landscape and visual damage.

Enviromena disagrees, as it has included in the plans a number of measures to achieve a significant net gain for biodiversity, significant landscape improvements through the planting of trees and hedges, a communal garden and measures to reduce flooding beyond planning requirements to support the wider area including the village of Fillongley. in their fight against flooding.

See also  How solar farms shape the local climate and vegetation in dry areas – SPE

Mark Harding, Enviromena’s European development director, said: “Until the committee meeting we had worked well with the head of development control, who had helped shape the project and there were no objections from statutory advisers. Despite a recommendation from the head of development control to approve the project, the committee members decided to reject our application, which was a complete surprise.

“We believe we have gone above and beyond the standard requirements in our planning application, not only in landscaping, but also in flood planning and mitigation, which has been identified by the local flood control group as a historic issue for the area.

“The government wants to build the country, and this is further evidence that this council is out of touch with national policies.

“Ultimately, we believe that there are no valid grounds for refusing our planning application and we will appeal this, at additional cost to both the local authority and Enviromena, and delay the implementation of this important green energy project.”

Source link

48.9MW Council Enviromenas farm refused solar Warwickshire
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Reuse unused satellite dishes in solar systems – PV Magazine International

By solarenergyJune 14, 20250

The CKW utility based in Switzerland has installed PV systems on unused satellite dishes at…

Interspace single-axis agrivoltaic systems have the lowest environmental impact in Europe – SPE

December 12, 2025

Vikram Solar unveils bifacial heterojunction module with 20 bubar – SPE

August 14, 2024

The Role of AI in Retaining Community Solar Subscribers

June 4, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.