Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

California Assembly passes Bill to force NEM 3.0 when the Zonnehuis is sold

June 7, 2025

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - 2.8 GWh bundled battery storage project receives US government approval – SPE
Energy Storage

2.8 GWh bundled battery storage project receives US government approval – SPE

solarenergyBy solarenergySeptember 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The U.S. Department of the Interior has given the green light to Nevada’s largest solar and storage development, the Libra Solar Project. It has also opened a comment period on the Bonanza Solar Project, which features a 195 MW/780 MWh battery storage system.

September 12, 2024 Marija Maisch

Secretary Deb Haaland

Image: Bureau of Land Management

By ESS news

The American Bureau of Land Management (BLM) announced this on Monday given a final decision approval of Arevia Power’s $2.3 billion, 700 MW solar, plus 700 MW/2.8 GWh battery storage Libra Solar projectthe largest colocation project in the state of Nevada.

Developed by Arevia Power about 20 miles south of the Fort Churchill substation in Yerington, near the Mineral County-Lyon County border, the project is expected to be in service by the end of 2027.

In June, Arevia Power announced the signing of a power purchase agreement with local utility NV Energy.

In the same announcement on Monday, the U.S. Department of the Interior said it had also approved NV Energy’s Greenlink West transmission project, which will run 350 miles from Las Vegas to Yerington and significantly increase the state’s transmission capacity.

The BLM has also opened a comment period for the Bonanza Solar Project Draft amendment to the resource management plan and environmental impact assessment. The proposed 300 MW solar facility would include a 195 MW/780 MWh battery storage system and an 8.4 mile generation line on approximately 5,133 acres of public land in Clark and Nye counties, near Las Vegas.

See also  Solar Energy in Agriculture Developing in New York State – SPE

To read further, visit our ESS news website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

approval battery bundled government GWh project Receives SPE storage
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Technology

Switzerland allows removable PV installation on rails – SPE

By solarenergyOctober 4, 20240

Swiss startup Sunways plans to build a pilot 18 kW PV system between the racks…

Fluence wins 2.2 GWh order for American-made energy storage systems

July 31, 2024

Terrepower opens solar panel recycling plant in Tennessee

April 25, 2024

Navien unveils residential air heat pump – SPE

July 10, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

California Assembly passes Bill to force NEM 3.0 when the Zonnehuis is sold

June 7, 2025

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Our Picks

California Assembly passes Bill to force NEM 3.0 when the Zonnehuis is sold

June 7, 2025

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.