Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Utility - Bechtel completes the Cutlass Solar 2 project in Texas using automation, robots and drones
Utility

Bechtel completes the Cutlass Solar 2 project in Texas using automation, robots and drones

solarenergyBy solarenergyMay 22, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Cutlass Solar 2 project in Fort Bend, Texas, has been completed and is generating electricity at full capacity. Bechtel built the 218 MW project, which is owned and operated by Sabanci Climate Technologies.

“We are excited to get Cutlass Solar 2 up to maximum capacity to deliver more renewable energy to Texans, support America’s energy transition and help achieve the Lone Star State’s goal of becoming the nation’s largest producer of solar energy ,” said Scott Austin, Bechtel General Manager of Renewable Energy and Clean Energy. “Bechtel is proud to partner with Sabanci Climate Technologies in their efforts to make clean, renewable energy more accessible to the people of Texas.”

“We partnered with Bechtel for our first solar venture because they are experts in delivering projects better and faster,” said Ismail Bilgin, president of Sabanci Climate Technologies. “Sending maximum power to the Texas grid is a fantastic milestone in this successful project and reaffirms that we were right to choose Bechtel. We look forward to continuing this success together on our next project, Oriana.”

To meet the project’s ambitious thirteen-month schedule, Bechtel leveraged data-driven automation, research robots, machine-driven equipment, drones, and an “every minute matters” mentality. Bechtel’s digital fulfillment hub used at Cutlass Solar 2 enabled 100% digital delivery through software integration. The hub collects data directly from equipment in the field and feeds the data into an interactive, map-based visualization. You can watch a video about Bechtel’s smart digital delivery at Cutlass projects here.

At the height of construction work, more than 300 people worked on the site. About 30% of the project’s professional staff and 15% of craft professionals were women, representing two and a half times the industry average.

See also  A 200 MW solar project in New Mexico is replacing an old coal-fired power plant

Bechtel will soon begin construction on the 232 MW Oriana Solar facility for Sabanci Climate Technologies in Victoria County, Texas.

News item from Bechtel

Source link

automation Bechtel completes Cutlass drones project robots solar Texas
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Policy

PowerChina signs 1.05 GW Terra solar deal – SPE

By solarenergyDecember 3, 20240

PowerChina has signed a contract with Manila Electric for the 1.05 GW Terra solar project…

The Cegasa of Spain presents its first battery at Utility-Scale-PV Magazine International

April 24, 2025

Wiltshire Council denies planning permission for 30MW solar farm

August 20, 2024

Internal internship programs help contractors take advantage of IRA tax credits

May 1, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025
Our Picks

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.