Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Modular solar energy solution helps mining operations switch to renewable energy sources – SPE
Technology

Modular solar energy solution helps mining operations switch to renewable energy sources – SPE

solarenergyBy solarenergyJune 13, 2024No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Modular solar specialist 5B’s pre-assembled and transportable Maverick solar solution has unfolded in another off-grid hybrid renewable energy project as the decarbonisation of Australia’s mining sector continues.

June 13, 2024 David Caroll

By pv magazine Australia

External energy specialist Zenith Energy has completed a 16.9 MW deployment of Australian manufacturer 5B’s prefabricated Maverick solar panel technology at a waste rock dump at Northern Star Resources’ Jundee gold mine operation in Western Australia.

The solar project, which includes 342 of the modular plug-and-play Maverick units, is part of the larger 46.6 MW Jundee mining hybrid renewable energy project, which is expected to meet approximately 56% of energy needs of the mine location.

The power plant, which also includes 24 MW of wind energy and a 12 MW/13.4 MWh battery energy storage system, is being supplied as part of a 15-year off-grid renewable energy purchase agreement (PPA) with Zenith.

Sydney-headquartered 5B said commissioning of the solar facility has begun, which will soon enable the integration of the new clean energy generation station with the existing gas-fired power station.

The Jundee project is the latest in a series of off-grid hybrid renewable energy projects being rolled out across mining operations in Western Australia.

Northern Star has also turned to renewable energy sources Carosue Dam And Porphyry mining sites, while Liontown Resources turned on a 95 MW power plant at its site earlier this month Kathleen Valley project also in the goldfields region of Western Australia. AngloGold Ashantis Tropicana mining activities and Bellevue Golds project of the same name has also signed PPAs for off-grid hybrid sustainable energy projects.

See also  Energielenker releases 'self-learning' energy management system

A regular feature of these projects is 5B’s Maverick system, a ground-mounted solar array of up to 90 PV panels mounted on specially designed frames that can be deployed and installed with minimal human labor. The modules are oriented in an accordion shape with a 10-degree slope and are electrically configured for quick installation.

Gerard Major, group manager of capital projects at Northern Star, said the system was ideally suited to the Jundee project as the technology allows unused land to be reused for productive solar energy generation.

“The 5B units’ low ground penetration technology, small footprint and high power density design have allowed us to leverage our existing waste rock landfill, freeing up a traditionally underutilized land resource for us to install clean renewable energy plants on,” he says. said.

The technology behind the Maverick has also secured 5B largest project to datewith the company awarded a 69 MW contract by a subsidiary of US-based energy giant AES Corporation.

The project, which also includes a 100 MW/400 MWh battery energy storage system, is being developed in a hurricane-prone area in Puerto Rico.

5B CEO David GriffinImage: 5B

5B Chief Executive Officer David Griffin said the Maverick arrays, which are mounted on composite steel concrete beams, are designed to withstand extreme winds.

“This deal clearly demonstrates the ability of the 5B team and our 5B Maverick prefabricated solar panel technology to meet the scale, performance and cost requirements of our utility-scale customers,” he said.

Griffin said the Puerto Rico project is part of a growing sales pipeline that has skyrocketed due to declining module prices, which have fallen dramatically since January.

See also  California winery installs solar with dual-axis tracking

“The strength of our pipeline continues to increase, especially as module prices decline,” he said. “We are seeing more and more cases where 5B Maverick beats the single access tracker on a levelized energy cost basis, where labor and land are limited, and the cost of bringing people, equipment, materials and infrastructure to project sites is challenging.”

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Source link

Energy helps mining modular operations renewable solar solution sources SPE switch
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Solis launches new portfolio of residential storage systems – SPE

March 6, 2026

Prices for TOPCon modules in China are higher now that March shipments are clear – SPE

March 6, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Solar eclipses mean that wind is the largest renewable energy source in the US

By solarenergyJanuary 25, 20260

According to a review of FERC data by the SUN DAY Campaign, solar energy accounted…

LG Electronics USA is working out a financing agreement for Home 8 ESS customers

June 24, 2024

Lion Energy will test the lithium battery production line to eventually reach an annual production of 24 GWh

October 9, 2024

Scandinavia, Italy can produce schedule hydrogen by 2030 – PV Magazine International

April 23, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026

Solis launches new portfolio of residential storage systems – SPE

March 6, 2026
Our Picks

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.