Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - 1.4 GW of BESS capacity could be co-located with the AR6 winners
Energy Storage

1.4 GW of BESS capacity could be co-located with the AR6 winners

solarenergyBy solarenergySeptember 10, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A chart showing the BESS potential of the CfD AR6 round. Image: Modo energy.

Modo Energy analysis has found that renewable energy projects awarded contracts under the Contracts for Difference (CfD) Allocation Round 6 (AR6) will include 1.4 GW of co-located battery energy storage systems (BESS). could facilitate.

Although BESS projects themselves cannot participate directly in the CfD auction, projects that have been awarded contracts can be placed together with a battery. Following changes to the rules after Allocation Round 4, BESS co-location is now a much easier prospect for generators, and AR6 saw a record number of awards for solar projects.

Modo Energy’s analysis shows that 5 GW of the 9.6 GW of renewable energy capacity allocated in AR6 could be suitable for, or has already unveiled plans for, co-located battery storage. As a result, as much as 1.4 GW of BESS capacity could be created as part of new renewable projects arising from the AR6.

Using an average ratio of 60 MW of BESS capacity for every 100 MW of solar generation capacity, Modo Energy has calculated that 1 GW of this potential BESS capacity could come from solar projects alone.

Of these, Modo Energy suspects that EDF Renewables’ 500MW Longfield Solar Energy Farm could bring together the largest battery in this allocation round with renewable energy sources. Although the location has a building permit for BESS co-location, it has no stated capacity; Based on the average ratios for known co-located BESS capacities from AR6, Modo Energy predicts that a BESS at Longfield would have a capacity of 300 MW, but if EDF Renewables chooses to deploy its solar generation and storage capabilities for this project match, a Longfield BESS could be as large as 500 MW.

See also  Italian startup offers green hydrogen generation, storage system for homes – SPE

The potential for co-located BESS of AR6 significantly exceeds that of AR5, an allocation round in which significantly less renewable capacity was awarded in total. Modo Energy estimates that 1.1 GW of the 3.6 GW of projects winning contracts in AR5 could see co-located BESS, which is expected to deliver a total of 750 MW of storage capacity.

A chart showing the BESS potential of the CfD AR5 round.
The BESS potential from the CfD AR5 round is significantly lower than that of AR6. Image: Modo energy.

The total battery capacity expected to be co-located with CfD-supported projects from AR4 to AR6 could be as high as 3.1 GW. Although none of the batteries planned for co-location with renewables from AR4 have commenced commercial operations, co-located batteries are not part of the CfD agreement and therefore do not have to come online on the agreed generator commissioning date.

According to Modo Energy, the number of co-located BESS projects as CfD renewable energy projects could be as much as eleven times the number of currently existing co-located BESS projects. There are currently eight co-located battery sites above 7MW commercially operational in the UK, and 77 sites from the AR4 – AR6 allocation rounds could be co-located with energy storage. If these 77 locations power their BESS next to the target commissioning date, these batteries could all be online by 2028.

Source link

AR6 BESS capacity colocated winners
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

EirGrid identifies a shortage of energy capacity in Ireland

March 5, 2026

Arevon’s 430 MW Project Increased Missouri’s Solar Capacity by Nearly 50%

March 5, 2026

China’s 600 MW/2.4 GWh storage facility will be the world’s largest CAES site – SPE

March 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

Bangladesh opens tender for 12 grid-connected solar energy projects with a total capacity of 353 MW – SPE

By solarenergyDecember 9, 20240

The Bangladesh Power Development Board is inviting bids for the installation of 12 grid-connected solar…

Global installed solar capacity will skyrocket by 2024

September 19, 2024

Solar panel technology -Standouts of Re+ 2025

September 17, 2025

Brand damage PV system at school in Belgium

April 5, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Our Picks

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.