Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - British regulator approves five subsea energy connections by 2032 – SPE
Technology

British regulator approves five subsea energy connections by 2032 – SPE

solarenergyBy solarenergyNovember 13, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The UK’s electricity regulator has approved five new undersea energy links to connect the UK with the Netherlands, Belgium, Germany, Ireland and between Northern Ireland and Scotland by 2032. Three will serve as traditional interconnectors, while two will also transport power from offshore. wind farms.

November 12, 2024
Lior Kahana

British electricity regulator Ofgem has approved five new subsea energy links to connect the UK to several European countries via the North Sea.

The five projects will be completed by the end of 2032. Three of the connections will be traditional interconnectors, while the other two will be offshore hybrid assets (OHA), which combine interconnection with electricity transmission from offshore wind farms.

“The cost to consumers of all five projects will be between £2.56 and £5 per year on individual consumers’ electricity bills between 2030 and 2055,” the regulator said. “However, Ofgem believes that the new interconnectors also provide other consumer benefits, such as greater security of supply and by providing export routes we are also supporting our offshore wind industry, reducing our reliance on importing hydrocarbons, which are subject to global price volatility .”

The approval documents state that the LionLink offshore hybrid asset (OHA) project will connect Dutch offshore wind farms to the UK electricity grid via an onshore landing in Suffolk, allowing each country to supply up to 1.8 GW of power. The second OHA project, Nautilus, will connect Belgium to the UK electricity grid via a connection point on the Isle of Grain in Kent, delivering up to 1.4 GW of capacity to both countries.

See also  Perovskite-silicon tandem solar cell based on hybrid interconnected layers achieves an efficiency of 28.47% – SPE

Of the traditional interconnectors, the longest is the 610 km Tarchon Energy Interconnector, connecting East Anglia and Niederlangen, Germany, with a total capacity of 1.4 GW. The Mares Connect, a 190 km cable, will run from Bodelwyddan, North Wales, to the Republic of Ireland, adding 0.75 GW of capacity. Finally, the 142 km LirIC cable will connect Kilroot in Northern Ireland to Hunterston in Ayrshire, Scotland, providing an additional 0.7 GW.

“With Britain expected to become a net energy exporter by the 2030s, these connections will equip us with leading technology to export more of our excess clean energy abroad,” said Akshay Kaul, Director General of Infrastructure from Ofgem. “They will also provide better access to energy imports, which together with domestic low-carbon energy sources such as nuclear and biomass will provide essential back-up energy sources when renewable generation is more limited here.”

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

approves British connections Energy regulator SPE Subsea
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Finance

Field Vozingen Energy Energy for two 100mWh Bess projects in Scotland

By solarenergyAugust 28, 20250

Lithium-ion OEM Energy Energy supplies 200 MWH battery energy storage systems (BESS) to developer-operator field…

The largest wastewater heat pump in the Netherlands goes online in Utrecht – SPE

September 11, 2024

VAT exemption is a ‘crucial step’ in the growth of the domestic battery market

May 7, 2024

Solar Servicing acquires mosaic activa, resumes PV -Loingen

September 25, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.