Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - West Sussex County Council launches public tender for 16 MW BESS
Energy Storage

West Sussex County Council launches public tender for 16 MW BESS

solarenergyBy solarenergyNovember 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The original plan was also to use second-hand batteries sourced from electric vehicles. Image: RES

West Sussex County Council has issued a tender (ITT) for a 16MW/32MWh battery energy storage system (BESS), with a two-hour run time.

The ITT is seeking private and public sector organizations to provide pre-construction services agreement (PCSA) services for the Halewick Lane BESS phase 3 project.

The proposed BESS will be built on the site of the previously abandoned North Sompting Waste Management Site, near Worthing. The PCSA contract will involve “designing, risk assessing, planning and completing all necessary tender information to provide a fixed price for the procurement and construction” of the project, West Sussex Council said, as part of a two-phase design and construction contract.

Under the current schedule, the project is expected to begin construction in July 2025 and enter service in the first quarter of 2027. It will represent approximately £23.6 million of capital expenditure.

The Halewick Lane project has been in progress for several years and has seen a number of changes and delays. Solar energy portal already referred to the project in 2018, when planning and decisions on the project were expected the following year.

The original plan was for a 1-hour, 24 MW BESS project, but the council changed course after consultation with “a range” of independent consultants.

The original plan also was to use second-hand batteries recycled from electric vehicles, rather than new systems, according to a September 2024 report to the Communities, Highways and Environment Oversight Committee. This plan changed “when government support for the umbrella project was withdrawn.”

The September report, written by Wayne Lewis, deputy director of environment and public protection, also details the County Council’s ultimately failed attempts to secure direct contractors from the private and public sectors, before opting for an open tender process through this ITT.

See also  Kona's 228 MW BESS gets the green light from the Scottsih government

Council initially signed a PCSA agreement with a private contractor, but the relationship was terminated after it failed to meet the terms of the contract. A similar deal with “a public sector owned framework” also fell through, after which the Council decided to issue an open tender based on what it called “a clear willingness of the market to work with the County Council work to realize this project. .”

Source link

BESS Council County launches public Sussex tender West
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

Zendure launches battery ranges for residential PV – SPE

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Jackery, Geneverse present new energy storage system for homes – SPE

By solarenergySeptember 12, 20240

The two US-based companies will showcase their new home energy system with up to 123.2…

Iberdrola switches on 210 GWH Spanish Pumped Hydro-Battery Project-PV Magazine International

March 9, 2025

China Solar Cell Rally stalls in the middle of deteriorating margin squeeze – PV Magazine International

August 16, 2025

Cuba opens Solar Park in the hope of Black -Outs to avert

February 24, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.