Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Australian utility switches to solar farm built for cyclonic conditions – SPE
Technology

Australian utility switches to solar farm built for cyclonic conditions – SPE

solarenergyBy solarenergyDecember 4, 2024No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

APA Group has officially opened a solar energy project designed to withstand sustained winds of almost 300 km/h, along with a co-located battery energy storage system in Western Australia’s Pilbara region.

December 4, 2024
David Caroll

By pv magazine Australia

Australian gas and electricity company APA Group has revealed that construction of its solar farm and battery project at Port Hedland in Western Australia’s Pilbara region is now complete and commissioning is underway. Commercial operations are expected to start in January 2025.

The Port Hedland project includes a 45 MW solar farm linked to a 35 MW/36.7 MWh battery energy storage system. They are connected to APA’s existing Port Hedland gas-fired power station and to the North West Interconnected System (NWIS) network and will supply electricity to BHP’s iron ore port facilities.

Sydney-based APA said that given the project site’s proximity to the northwestern Australian coastline, the solar farm is designed to cope with severe cyclonic conditions and is capable of withstanding sustained winds of 288 km/h.

“While solar installation in the inland Pilbara is relatively easy, coastal solar deployment has stagnated due to the difficulty in designing renewable energy infrastructure that can withstand the extreme wind speeds associated with deal with cyclones, which are prevalent in the region. ,” the company said.

Image: APA group

APA said the solar farm, built by Monford Group, includes 32,000 steel poles driven 2.2 meters into the ground, steel cross-sections up to 4mm thick, and 119,056 solar panels positioned at a 10-degree angle to reduce wind forces . . It says the structure is secured with 3.2 million bolts, with “the design and equipment rigorously calculated and tested to ensure it is cyclone resistant.”

See also  Chinese scientists develop colorless solar center for PV windows - PV Magazine International

The battery is able to respond to the unique variability of renewable energy in the Pilbara, and in particular cloud events, allowing solar energy output to drop from 100% to less than 20% in less than two minutes.

“This project demonstrates how solar, battery and gas generation can be combined to successfully transition remote mining operations,” said Adam Watson, CEO and Managing Director of APA.

BHP WA Iron Ore Asset President Tim Day said the solar farm is expected to meet the majority of the daytime energy needs of the miner’s massive port facilities in Port Hedland. The remaining power needs must be met via the existing gas-fired power station of BESS and APA.

“This power purchase agreement is a step forward on BHP’s global journey to decarbonisation, and it will also play an important role in the future of sustainable energy in the Pilbara,” he said. “From electrifying mining equipment and switching to renewable energy sources like this, to working with the shipping industry and steelmakers to help them reduce their emissions, it’s all about doing our part in the global effort to decarbonize the economy to make.”

Image: APA group

Decarbonizing the energy-intensive and remote operations of Australia’s resources sector will be a major undertaking. Watson estimates that achieving this feat in the Pilbara alone will cost approximately AUD15 billion ($9.72 billion).

While recognizing the scope of the task ahead, Watson said the Port Hedland project demonstrates the ability to replace thermal generation with utility-scale solar generation, while maintaining cost competitiveness and security of supply in remote areas.

See also  Australian state prioritises pumped hydro projects – SPE

“It is a clear demonstration of our ability to support customers with reliable, affordable energy infrastructure with lower emissions,” he said.

The Port Hedland solar and battery project is the first project APA has since rolled out in Western Australia Purchase of AUD 1.7 billion of Alinta Energy’s assets in the Pilbara.

APA’s potential next projects include an expansion of the Port Hedland solar and battery project, and a 30 MW expansion at the Chichester Solar Farm. The company is also exploring building electricity transmission infrastructure to connect Port Hedland to the mines around Newman as part of a strategy to electrify the region.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Australian built conditions cyclonic farm solar SPE switches utility
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Finance

Sweden to cut subsidies for solar energy and eliminate tax breaks for micro-production of electricity – SPE

By solarenergySeptember 19, 20240

The Swedish government is considering reducing the subsidy for solar installations and abolishing the tax…

Indosolar shares to resume trade after six years of suspension

June 19, 2025

Largest UK pumps Hydro -scheme granted permission – PV Magazine International

April 3, 2025

CPX and PanelClaw announce brand merger – SPE

June 19, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.