Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

British Solar Renewables wins call for 29 MW solar power plant

July 28, 2026

DfE’s school solar PPA model could ’cause imbalance’

July 28, 2026

Agrivoltaic energy is not one thing. Our policy should not be either.

July 28, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Tuesday, July 28
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Finance - British Solar Renewables wins call for 29 MW solar power plant
Finance

British Solar Renewables wins call for 29 MW solar power plant

solarenergyBy solarenergyJuly 28, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

British Solar Renewables (BSR) has been granted planning permission for its 29MW Lower Wyke Solar Park on appeal.

The 86 hectare Hampshire project was refused by Basingstoke and Deane Borough Council in June last year, despite being recommended for approval by planning officers. BSR appealed the refusal and a hearing took place in May this year.

The planning inspector determined that the renewable energy, biodiversity and wider public benefits of the project outweighed the identified harm, and granted planning permission for the development. BSR has committed to a net biodiversity gain of 217% in habitats and hedgerows.

The developer discussed it approach to biodiversity in an interview with Solar energy portal earlier this year.

This decision is in line with the National Planning Policy Framework (NPPF), which per year update introduced in 2024states that the “broader environmental benefits associated with increased production of energy from renewable sources” should take priority over damage to the landscape.

Related:UK solar project developers consider ‘ready-to-repower’ phase amid CfDs and grid connection challenges

The initial recommendation for site approval recognized that “the proposed development would have a detrimental impact on both the local landscape character of the area and on the National Landscape” but stated that the mitigation measures that BSR would be required to take meant that “the adverse impacts would be mitigated and reduced whilst providing a form of energy from a renewable source”.

In refusing the application, Basingstoke and Dean Borough Council stated that the scale, layout and design of the site would have “an unacceptable adverse impact on the landscape character and visual amenity of the area”.

See also  Court of Court earns a patent for EV-charger platform for solar energy

The Planning Inspectorate’s decision to approve the project is in line with the majority of solar refusals that have been appealed. process more than doubles the time between an initial submission and an approval.

Project Manager at BSR, Marcus Camm, said: “This decision marks a significant milestone for the project and shows how well-designed solar developments can play a crucial role in strengthening energy security, supporting the UK’s transition to net zero and delivering lasting benefits for both local communities and the natural environment.”



Source link

British call plant power Renewables solar Wins
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

DfE’s school solar PPA model could ’cause imbalance’

July 28, 2026

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026

Croatia’s first energy community starts sharing solar energy

July 27, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Hinen unveils all-in-one home energy storage solution – SPE

By solarenergySeptember 30, 20240

Chinese manufacturer Hinen has launched an integrated battery energy storage system with power options ranging…

Inox Clean buys US PV production assets from Boviet Solar for $750 million

May 16, 2026

The scoop for solar policy: August 2024

August 5, 2024

Australia Carbon Offset Regulatory Framework Explained

June 24, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

British Solar Renewables wins call for 29 MW solar power plant

July 28, 2026

DfE’s school solar PPA model could ’cause imbalance’

July 28, 2026

Agrivoltaic energy is not one thing. Our policy should not be either.

July 28, 2026

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026
Our Picks

British Solar Renewables wins call for 29 MW solar power plant

July 28, 2026

DfE’s school solar PPA model could ’cause imbalance’

July 28, 2026

Agrivoltaic energy is not one thing. Our policy should not be either.

July 28, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.