Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - EDP ​​​​starts construction of 50MW/100MWh Kent BESS
Energy Storage

EDP ​​​​starts construction of 50MW/100MWh Kent BESS

solarenergyBy solarenergyDecember 10, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The two-hour BESS will be connected to the Richborough substation electricity grid and is expected to be fully operational in 2025. Image: EDP.

Portuguese utility EDP has started building its first standalone battery energy storage (BESS) in Europe through EDP Renewables (EDPR).

The 50MW/100MWh BESS, also known as the Harrington Franklin storage project, is located at the Richborough Energy Park near Sandwich, in Kent. The two-hour BESS will be connected to the Richborough substation electricity grid and is expected to be fully operational in 2025.

EDP ​​acquired the project from British battery and solar developer Tupa Energy in 2023, a few months before acquiring a second British project, a 50 MW BESS located near Alness in the Highlands.

The company is also developing a 36 MW Spanish BESS. Until now, the warehousing activity has been focused on the US, through EDPR North America, covered on our sister site, Energy storage.news. EDPR has nearly 200 MW of contracted storage capacity in North America and more than 4 MW under construction in the Asia-Pacific region.

In its business plan for 2023-2026, EDP says it aims for a storage capacity of more than 500 MW worldwide. This is expected to be achieved mainly through co-located assets, with some contribution from standalone projects such as the Kent project.

Duarte Bello, CEO of Europe at EDP said: “Storage will play a crucial role in the future of renewable energy and we at EDP are proud to be among the players investing in this important area of ​​the sector. The Harrington Franklin project is a clear example of both our ambition and our ability to develop storage systems that support grid flexibility and help drive Europe’s energy transition.”

See also  All PPA structures for renewable energy at a glance – SPE

EDPR’s solar and wind developments – the renewable developer has a global pipeline of wind and solar assets exceeding 15 GW – mean it has a vested interest in storage, given the technology’s potential to boost EDP’s intermittent generation capacity thereby limiting price and profile risk.

When EDPR first acquired Kent BESS, it said Britain was the most advanced market in Europe for the development of battery storage assets, due to its extensive regulatory framework.

As the pipeline of BESS developments in Britain continues to grow, developers are calling on the National Energy System Operator (NESO) to improve skip rates – the frequency at which the system operator skips batteries to use more expensive methods in the Balancing Mechanism. (BM) – claiming that skipping batteries is holding back investment and driving up consumer bills.

Source link

50MW100MWh BESS construction EDP Kent starts
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Zelestra continues construction of two Texas projects

March 5, 2026

EirGrid identifies a shortage of energy capacity in Ireland

March 5, 2026

Real estate company Clayco starts a company for the development of solar energy

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Maxeon Solar ensures that the company can focus exclusively on the American market

By solarenergyNovember 27, 20240

The solar panel manufacturer announced a five-year lease for a factory in Albuquerque, New Mexico.…

How American is your solar panel?

September 24, 2024

Yorkshire’s largest solar farm goes live

October 24, 2024

Jinkosolar achieves world record efficiency of 27.02% for Topcon Solar Cell – PV Magazine International

June 25, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.