Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Wooden PV canopy for EV charging station in Austria – SPE
Technology

Wooden PV canopy for EV charging station in Austria – SPE

solarenergyBy solarenergyDecember 31, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Norway’s Mer Group, in collaboration with local partners, has installed a trial charging station for electric vehicles with a wooden roof in Spittal an der Drau, Austria.

December 31, 2024
Valerie Thompson

MER Ladepark Spittal Austria

Image: HASSLACHER Group

Mer Group, a Norwegian charging solutions company owned by Statkraft, has installed a 36.27 kW wooden PV canopy at a pilot EV charging station in Spittal an der Drau, Austria.

Austrian PV module manufacturer Sonnenkraft supplied the bifacial solar panels for the charging station, a company spokesperson said pv magazine.

The site features 117 double-sided glass-glass modules, each with a power of 310 W, installed by Austria-based Vivatro. The installer also took care of the system integration, including panel installation, inverters, transformer connection and electrical work.

The spruce PV canopy structure includes 18 fast charging points with a capacity of up to 400 kW.

Several design features of the PV canopy protect the location from wet weather. The Sonnenkraft spokesperson said Vivatro used overlapping dry glazing sealant technology to secure the panels, replacing conventional silicone sealants. This method provides protection against the elements and requires less maintenance.

According to Austrian wood supplier Hasslacher Norica, the wooden parts were installed with a minimum of 30 cm space between the end edge and the water-bearing level. The facilities in Stall im Mölltal and Hermagor, Austria, supplied the materials.

Hasslacher Norica also provided logistics support and modular prefabricated components with a sheet steel foundation, allowing the timber structure to be built quickly in four days, the company said.

The EIA electric vehicle station project was not the first wooden PV carport of its kind built by Hasslacher Norica. It has completed pilot projects for Germany-based Energie Baden-Württemberg (EnBW) HyperNetz, installing two identical EnBW fast-charging parks in Lichtenau and Nahetal, Germany. It has also supplied timber for a Vivatro charging station in St. Veit an der Glan, Austria, and for several charging station projects in the UK.

See also  'It may be difficult to find female role models, but they are out there' – SPE

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Austria canopy charging SPE Station wooden
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Oleic acid anti-pollution coating for solar panels – SPE

March 5, 2026

Ground-mounted test field for Perovksite solar panels goes online in China – SPE

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Electric mining graders are powered by the Fortescue Zero battery system – SPE

By solarenergyOctober 3, 20240

Canadian-based underground heavy-duty vehicle manufacturer MacLean will supply 30 electric-powered graders to Australian resources giant…

New method to calculate the levelized costs of hydrogen – SPE

August 9, 2024

What is the cooking in PV? – PV Magazine International

February 6, 2025

Brand-exclusive solar inverter + battery pairings save customers more money in evolving markets

August 5, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.