Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - The authorities grant Root-Power permission for a 40 MW Yorkshire BESS
Energy Storage

The authorities grant Root-Power permission for a 40 MW Yorkshire BESS

solarenergyBy solarenergyJanuary 24, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A view of the approved site. The BESS in North Yorkshire will be connected to the Osgodby network delivery point and is sited to make optimal use of natural shielding. Image Root force.

Developer Root-Power has received planning permission for a 40MW/80MWh battery storage site in Selby, North Yorkshire.

The battery energy storage system (BESS) developer launched in July 2024. It is backed by the YLEM Group and now has more than 2GW of projects in the pipeline in the UK.

The BESS in North Yorkshire will be connected to the Osgodby network delivery point and is sited to make optimal use of natural shielding. Root-Power will work with highway authorities to improve local road infrastructure as part of its development plan. The project will also deliver a net biodiversity gain of 40.72%.

Root-Power director Neil Brooks said the consent was a “great start” to 2025.

At the launch, Root-Power has appointed planning consultancy firms Lanpro, PWA Planning, RCA Regeneration, ELG Planning and Clive Fagg Planning to accelerate the delivery of the 40-project pipeline.

One of the largest projects in the pipeline, the 100MW/200MWh Granborough Project in Buckinghamshire, has already reached the advanced development stage of the planning process.

Recently, Glasgow City Council approved a 50MW/100MWh BESS to be located in the center of Glasgow. The site, a former shipping container storage site located close to Ibrox Stadium, will accommodate up to eight BESS containers, as well as a 33kV/600V BESS transformer, a 33kV substation and other associated infrastructure.

It is one of four Root-Power projects to receive approval so far, and construction on all four will begin this year.

Brooks wrote an exclusive article for Solar energy portal sister site Current±, He calls batteries “the most adaptable solution for stabilizing the intermittent nature of wind and solar power generation.”

See also  Iron-Natrium Battery to back up the fire-sensitive community in California-PV Magazine International

However, he noted that the BESS sector is not sufficiently supported in the UK energy mix, adding that “to fully realize the benefits of BESS, the UK energy sector must advocate for their value in the energy transition, consumer awareness should increase and push for reform plans to accelerate adoption and encourage investment opportunities.”

Source link

authorities BESS Grant permission RootPower Yorkshire
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

Low-pressure hydrogen bridges seasonal gaps in Japanese solar-powered buildings – SPE

April 22, 2026

SolarEdge focuses on C&I with new all-in-one battery – SPE

April 22, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Solar-Air -ground CO2 Heat pump system for maximizing renewable energy sources PV Magazine International

By solarenergyApril 24, 20250

Researchers in Italy have designed a new carbon dioxide heat pump that can work with…

Ireland’s battery storage fleet set to grow to 13.5 GWh by 2030 – SPE

November 14, 2024

The carbon regime has yet to come into effect, but the voluntary market is already buzzing

July 13, 2024

Government Joe Lombardo asks Dept. or interior to Unfreeze Solar Development in Nevada

August 8, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Our Picks

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.