Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - The authorities grant Root-Power permission for a 40 MW Yorkshire BESS
Energy Storage

The authorities grant Root-Power permission for a 40 MW Yorkshire BESS

solarenergyBy solarenergyJanuary 24, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A view of the approved site. The BESS in North Yorkshire will be connected to the Osgodby network delivery point and is sited to make optimal use of natural shielding. Image Root force.

Developer Root-Power has received planning permission for a 40MW/80MWh battery storage site in Selby, North Yorkshire.

The battery energy storage system (BESS) developer launched in July 2024. It is backed by the YLEM Group and now has more than 2GW of projects in the pipeline in the UK.

The BESS in North Yorkshire will be connected to the Osgodby network delivery point and is sited to make optimal use of natural shielding. Root-Power will work with highway authorities to improve local road infrastructure as part of its development plan. The project will also deliver a net biodiversity gain of 40.72%.

Root-Power director Neil Brooks said the consent was a “great start” to 2025.

At the launch, Root-Power has appointed planning consultancy firms Lanpro, PWA Planning, RCA Regeneration, ELG Planning and Clive Fagg Planning to accelerate the delivery of the 40-project pipeline.

One of the largest projects in the pipeline, the 100MW/200MWh Granborough Project in Buckinghamshire, has already reached the advanced development stage of the planning process.

Recently, Glasgow City Council approved a 50MW/100MWh BESS to be located in the center of Glasgow. The site, a former shipping container storage site located close to Ibrox Stadium, will accommodate up to eight BESS containers, as well as a 33kV/600V BESS transformer, a 33kV substation and other associated infrastructure.

It is one of four Root-Power projects to receive approval so far, and construction on all four will begin this year.

Brooks wrote an exclusive article for Solar energy portal sister site Current±, He calls batteries “the most adaptable solution for stabilizing the intermittent nature of wind and solar power generation.”

See also  RWE is progressing plans for 320MW solar NSIP in Yorkshire

However, he noted that the BESS sector is not sufficiently supported in the UK energy mix, adding that “to fully realize the benefits of BESS, the UK energy sector must advocate for their value in the energy transition, consumer awareness should increase and push for reform plans to accelerate adoption and encourage investment opportunities.”

Source link

authorities BESS Grant permission RootPower Yorkshire
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Atlantic Green activates its first BESS

By solarenergyApril 28, 20240

The project is based in Buxton. Image: Atlantic Green. Battery energy storage developer Atlantic Green…

Longi, ANU develops a gettering-based process to improve the quality of the n-type wafer

September 24, 2024

Optimization of electrically conductive adhesives for interconnections of solar cells – SPE

July 4, 2024

Solar energy is crucial to achieving the 2030 decarbonization targets

July 26, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.