Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Bluefield Solar, Lightrock Power Secure Planning for 100 MW Bess
News

Bluefield Solar, Lightrock Power Secure Planning for 100 MW Bess

solarenergyBy solarenergyJanuary 24, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The Bess facility is the second project that Bluefield and Lightrock have received permission for this week. Image: Bluefield Solar.

Developer Lightrock Power has received a building permit for a 100 MW Battery Energy Storage System (BESS) of the Mid Sussex District Council.

The site of the Energy Stability Project Libra, which can be delivered in collaboration with the Bluefield Solar Income Fund, will be a total of 1.28 hectares, 450 m east of the Bolney -Sap substation. It includes 52 battery storage containers and construction is expected to take nine months as soon as the engineering, purchasing and construction contracts (EPC) are obtained.

Plans for the site include making new hedges together with restoration and improvements to existing ones. Image: Lightrock Power.

According to the companies, although the Libra project has been submitted before mandatory standards for biodiversity Net Gain (BNG) was drawn into operation, the development will still meet what is now required. This is in accordance with the dedication of Lightrock’s founders to build nature -friendly projects.

The Bess facility is the second project that Bluefield and Lightrock have received permission for this week, after they have already taken the passage for a 40 MW Sun Factory near Barry, Vale or Glamorgan.

The development, Parc Worldton Solar Farm, will yield a 55% net profit of biodiversity. In 2021 the developer collaborated with the RSPB and IT and collaborated with nature organizations, including the UK Wild Otter Trust. The Libra Bess project will give priority to the Turtle Dove population in its BNG measures.

Head of Planning and the Environment at Lightrock Power, Jo Mott, said that the permission was received particularly well because “the planning process was hindered by fluctuating Bess safety requirements”.

Rick von Poten, head of the schedule at Lightrock, added: “The importance of receiving permission for scales today cannot be underestimated if the alternatives could have had consequences in the light of connection reform and clean power 2030 on our grid connection . ”

See also  Eternal Sun offers solar simulators for space PV testing – SPE

Reforms of the connection process and the Location element to give permission The fact that the Schone Power 2030 plan increases means that developers are confronted with uncertainty in their project time lines. The National Energy System Operator (NESO) recently PAY RASTER CONTRACTIONSand more coverage of the ongoing reforms of the connection can be found on our sister site, Current ±.

Source link

BESS Bluefield Lightrock planning power secure solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

What the only Big Beautiful Bill Act means for the American residential solar energy – PV Magazine International

By solarenergyJuly 9, 20250

By PV Magazine USA On July 4, US President Donald Trump signed HR 1 in…

All-perovskite tandem solar cell based on wide band gap perovskite achieves an efficiency of 29.1%

January 23, 2025

Qair lands permission for 49.9 MW Bess

July 4, 2025

The largest PV installation on Scandinavia roofs goes online-PV Magazine International

January 26, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.