Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Finance - The government proposes a longer commissioning window for solar CFDs
Finance

The government proposes a longer commissioning window for solar CFDs

solarenergyBy solarenergyFebruary 24, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
Although most generating technologies that are eligible for CFD assignment TWCs of 12 months have, Solar has a three-month window due to the relatively fast pace of commissioning. Image: Unsplash.

The British government consults on reforms of its auction scheme for renewable energy sources, including a longer target window (TWC) for Solar PV.

The changes, of which the government says it “clears the road” for more renewable projects that will be online by 2030, would reflect the increasing size of solar projects in the pipeline of the UK.

After explaining the capacity of generating goalmates in its Clean Power 2030 Action Plan (CP30), the government addresses the barriers to achieve its goal by reforming the CFD schedule to offer investors more certainty and a “better” Deal for consumers “.

According to the Department for Energy Security and Net Zero (Desnz), the UK has already installed or committed 30.7 GW offshore wind, with another 7.2 GW capacity permission, at a target capacity range of 43-50 GW required for clean electricity by 2030 .

The proposed reforms also include relaxed criteria for the planning allocation for offshore winds with fixed soil and increasing the CFD contract period after 15 years.

Energie -Secretary Ed Miliband said: “Our daring new reforms will give developers the certainty they need to build up clean energy in the UK, to support our mission to become a superpower of clean energy and for good accounts to get. “

The applications for AR7 are expected to be opened in the summer of this year. The government’s consultation runs until March 25 and its decision is expected before AR7 is opened.

Last year’s allocation round, AR6, had the largest budget assignment ever and delivered 128 projects with 9.6 GW capacity. CP30 promised CFD reform to better make the development of renewable energy sources possible.

See also  Enstall takes over the German solar energy supplier Schletter

Longer commissioning window for Zonne -PV

According to the current CFD rules, developers must include a starting date for a three-month target window (TWC) in their allocation round, which must overlap with one of the delivery years offered during the CFD dental round.

If a generator has not submitted his project at the end of the TCW, the 15-year payment term will start in any case and the project will receive less subsidy on day by day (known as ‘Contractterosie’). This ‘Cliff Edge’ offers a financial incentive for CFD generators to deliver their projects during the TCW to protect maximum available subsidy.

Although most generating technologies that are eligible for CFD assignment TWCs of 12 months have, Solar has a three-month window due to the relatively fast pace of commissioning.

However, the government acknowledged that the increasing size of projects in the pipeline could become a “potential barrier for the use of solar energy”.

Handelschaan that represents the British sun sector, Solar Energy UK, welcomes the consultation. The Chief Executive, Chris Hewett, said:

“We are pleased to see the absorption of measures that support the growth of the sun sector, in particular a proposal to grant more leeway for commissioning times, and to extend contract periods after 15 years.

The consultation offers the possibility to refine the CFD mechanism, so that it remains suitable for the purpose and investments in infrastructure for clean energy. “

A Version of this article first appeared on our sister site, Current ±.

Source link

CfDs commissioning government longer proposes solar window
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
News

Trump would ‘irreparably’ harm the pace of clean technology rollout: Kerry

By solarenergyJune 29, 20240

Trump would ‘irreparably’ harm the pace of clean technology rollout: Kerry Veteran US diplomat John…

Risen claims 30.99% Efficiency for Perovskiet-Silicon Tandem Solar PV Magazine International

February 21, 2025

How many solar panels do you need? New year, new energy

April 28, 2024

Ameresco is breaking ground on a landfill solar project in New Hampshire

August 18, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025
Our Picks

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.