Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Root-Power awarded permission for 40 MW/80mWh Rotherham Bess
Energy Storage

Root-Power awarded permission for 40 MW/80mWh Rotherham Bess

solarenergyBy solarenergyFebruary 26, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A 3D render from the upcoming site. Image: Root-Power.

Battery Energy Storage System (Bess) Developer Root-Power has announced that it has been received a building permit for a Bess of 40 MW/80mWh in Rotherham.

The project, near Brinsworth, Rotherham, started early development in August 2024, as part of the bumper harvest of Root-Power of 40 BESS planning applications at that time. The project will be on a strip of land next to the M1 -Velweg, and although it was previously registered as “green space”, the site private ownership was not accessible to the public and was too small for any agricultural use; As such, the application was unanimously approved by the planning committee.

The location in addition to the highway also offers a considerable amount of noise research of the development. The development is also expected to yield a net profit of biodiversity of approximately 32.76% compared to the current basic line of the site.

A date for construction has not yet been revealed, but the root force has stated that it expects that it will be actively confirmed in mid -2028.

Neil Brooks, director of Root-Power, said: “We are delighted to announce that we have protected the building permit for a new site, this time our 40mw site in Brinsworth, Rotherham.

“Special mention must go to our origin team that has carefully selected an almost perfect location for this Bess project. Managing competing restrictions is always difficult when planning a project, so finding a suitable location in just one mile of the connection point in an urban area, without causing unacceptable noise or visual impact on sensitive receptors, is a real achievement . We are happy to see that the planning committee has supported our application unanimously, which is a real voice of trust in our process and team. “

See also  Exagen lands permission for 34 MWP Solar and 75MW Bess

This is the fourth Root-Power of the planning, so far granted in 2025. Earlier this month the company received a building permit for a 34 MW/68MWH Bess in the Scottish Highlands, located in Dounreay on the north coast of Scotland, with a schedule connection, with a grid connection, with a grid connection, with a grid connection, with a grid connection, which has a schedule connection date of 2026. In January the company had also received permission for a 40MW/80mWH Bess in Selby, North Yorkshire, and recently received permission for a project in County Durham.

This means a strong start of 2025 after a very successful 2024 for the company, which ended with the allocation of the planning approval for a large new project in the Stadscentrum of Glasgow. The Broomlan Road Bess, a 50 MW/100MWH Bess, is now in construction and will be close to Ibrox Stadium in the city center.

Source link

awarded BESS MW80mWh permission RootPower Rotherham
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025
Leave A Reply Cancel Reply

Don't Miss
Policy

Online calculator determines storage requirements for energy transition – SPE

By solarenergyJune 19, 20240

The “Dunkelflaute” is a bogeyman for the energy sector, but a new tool from the…

Czech utility unveils technology to fix solar panels in unstable ground

May 28, 2024

Lightweight mobility with vehicle-integrated photovoltaic solar energy – SPE

August 27, 2024

The world’s first gigawatt-scale offshore solar project is underway

November 17, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025
Our Picks

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.