Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - ULC Technologies Solar Robots have potential to install 600 panels in 10 hours
News

ULC Technologies Solar Robots have potential to install 600 panels in 10 hours

solarenergyBy solarenergyMarch 3, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Robotics company ULC Technologies has been contracted by Rosendin for a Robotic solution for installation of solar module. The robot systems, which have already done field tests at Real-World Utility-Scale Solar Building locations, work in collaboration with competent traders to speed up the construction time frames, to increase the safety of employees and support the expansion of the production of renewable energy.

“The solution that we have designed and developed consists of three separate autonomous systems, a panel institutional robot and two panel carrier robots that collaborate with human operators to install solar PV panels in the middle to large-scale solar facilities,” said Ali Asmari, director of R&D project management at ULC Technologies. “The robot in the panel is a robot platform with build quality with an integrated robot arm to perform semi-autonomous installation of solar panels in collaboration with human operators. As soon as the robot positions the panel, field operators can lead it in position and complete the installation with mounting hardware and electrical connections. “

The two panel carriers robots wear pallets of solar panels between the loading area and the installation location of the Robot panel – a continuous power supply of panels and elimination of downtime.

The installation robots of the solar panel are designed to withstand exposure to high temperatures, while navigating terrain through a series of construction site, including deep mud, uneven surfaces and more. This in advance work enable ULC to quickly go from the conceptualization phase of the project to field tests in just 18 months.

See also  Catl Leapfrogs competitors, releases 9-MWH Bess

The robots were extensively tested in the field on solar building sites on Utility scale, which resulted in a robot system that is able to be able to production production rates of less than one minute per panel. In a ten -hour team, ULC estimates that the robots can install 600 panels together with a crew of 2 people.

Traditional installation methods require extensive manual labor. Large solar farms can have more than 1 milion panels that need to be installed and with each panel with a weight of 80 to 100 lbs, this translates into strenuous work. Moreover, the remote nature of solar stands makes it a challenge for contractors to find sufficiently trained work to meet the demand.

“Working with Rosendin’s use case, we have designed and developed a solution that brings a revolution in the installation of solar panels at large -scale locations,” said Steve Green, VP of company development for location and inspection at SPX Technologies, the mother company of ULC Technologies. “Extensive field tests proved how to relieve the robots heavily from employees and supplement their expertise with a supporting tool that helps employees protect and be more productive.”

News item from ULC Technologies

Source link

hours install panels potential robots solar Technologies ULC
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Root-Power appoints consultancy firms to prepare 40 BESS applications

By solarenergyAugust 14, 20240

A map of Root-Power’s British BESS pipeline. Image: Root force A new player in the…

Chinese PV industry Letter: Daqo places $ 345.2 million net loss for 2024

February 28, 2025

Prices for PV modules at intersections

January 22, 2025

Mitsubishi Electric launches water-to-water heat pumps for commercial, industrial applications – SPE

September 6, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.