Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Natpower to consult on plans for 1GW Bess
News

Natpower to consult on plans for 1GW Bess

solarenergyBy solarenergyMarch 14, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A map of the proposed Bess site. Image: Natpower.

Developer of Renewable Energie Natpower has opened a Community Consult for a proposed 1 GW Battery Energy Storage System (BESS) in Lecisetershire.

The proposed Swinford Bess would be in the existing Swinford Windpark, a 22MW development that is owned and is operated by Vattenfall that has been operational since 2012. In addition to the Bess units themselves, the project will also include a transmission connected substation and significant biodiversity improvements.

Nearby residents are invited to share their feedback online until April 11, 2025, and a public information event will be held on March 24 in Swinford Village Hall. Natpower has stated that it is planning to submit a planning application to Harborough District Council in late spring.

As part of the consultation, Natpower is also planning to discuss the potential recipients for the proposed Community Benefit Fund, the Energy Transition Foundation Community. The developer has stated that the Energy Transition Foundation Community could contribute to about £ 1 million annually to community initiatives in the area.

John Sturman, managing director at Natpower, said: “Battery storage will play an essential role in supplying clean, safe and affordable energy for the VK and we look forward to meeting the local community in Swinford to discuss our plans, in particular how our site can help to deliver biodiversity in the wild. We would like to hear what the community would like to see to become more sustainable. “

Natpower follows Gigawatt scale projects

Earlier this year, Natpower revealed that it had submitted a planning application for another two 1GW Bess projects, the Mowbray Energy Storage Project and the Bellmoor Energy Storage Project.

See also  Ameresco is breaking ground on a landfill solar project in New Hampshire

The Mowbray Energy Storage Project will be on 93 hectares of land north of the village of East Rounton, North Yorkshire. Lithium ion batteries are planned to be used on site for this project and the system will have a duration of four hours.

The Bellmoor Bess, located near the village of Thirsk, also in North Yorkshire, will also take a capacity of 1 GW and four hours. If the planning application for both projects is granted by the North Yorkshire Council, construction could start as quickly as the end of 2026 and closed at the end of 2028, with commercial activities that start in December 2028.

Last March Natpower announced plans to bring more than 60 GWH battery capacity online in the VK by 2040, as part of an investment of £ 10 billion in the British battery energy storage sector.

Source link

1GW BESS consult NatPower plans
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Until UK Solar Acquisition sites unveiled

June 6, 2025

GASSPIJPLEMENT COMPETITION COMMITTESS 130-MW TEXAS SOLAR PROJECT

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

US solar tariffs and the shadow of bigger trade measures

By solarenergyMay 16, 20240

Intensified trade measures against China through higher tariffs on imported solar and battery cells are…

Israel aimed at 100,000 new solar roofs against 2030 – PV Magazine International

February 24, 2025

Bechtel will build 25 MW solar panels for the copper mine in Utah

November 14, 2024

Solar module prices that are not influenced by Tariff Chaos – PV Magazine International

April 26, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025
Our Picks

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.