Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Lithuanian grid operators can now shut down solar power plants without cybersecurity measures

June 8, 2026

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Root-Power lands planning permission for 30 MW Bess
Energy Storage

Root-Power lands planning permission for 30 MW Bess

solarenergyBy solarenergyMarch 27, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A 3D Render of the Ellen Road Bess project. Image: Root-Power

Battery Energy Storage System (Bess) Developer Root-Power has received a building permit for a Bess of 30 MW/60mWh in Greater Manchester.

The development of Ellen Road Bess is located next to the M62 Fastweg near Rochdale, Greater Manchester. The site was chosen because of the limited agricultural potential, whereby the proximity of the highway presented both challenges and benefits for the planning process, whereby the high level of environmental background noise helps the approval of development. Current plans for the site only occupy 0.6 hectares, but Root-Power notices that the site has the potential to be expanded if the need occurs.

The building permit was secured in less than five months, without outstanding objections from legal consulti’s.

The project has so far come as part of a successful series of planning approvals in 2025. Last week the developer announced that it had received a building permit for a 100 MW/200MWH Bess in SLAEFORD, Lincolnshire, who also received approval in less than five months.

Neil Brooks, director of Root-Power, said that the company was ‘enthusiastic’ to guarantee the building permit for the Ellen Road Bess, and added: “Greater Manchester is one of the most energy-intensive regions in the UK, and this project at Rochdale will add important spring power and security to the local network”. Brooks also noted that the company expects an exciting few months in advance, with a large Bess project that will soon be live and three projects in the detailed design phase.

A strong start for Root-Power

This year has already been full of success for Root-Power, a relatively new access to the British BESS market.

See also  Electoroute works together with Arenko for the British Bess market input

Ellen Road is the sixth Bess project for which the developer has received the planning state in the past three months. Last month, Root-Power announced that the building permit had been granted for a 40 MW/80mWh Bess in Rotherham; Just like the Ellen Road Bess, this is also next to a large highway.

Earlier that same month, the company insured the planning state for the Dounreay Bess, a project of 34 MW/68MWH in the Scottish Highlands; Once connected to the grid in 2026, the Bess Noord -Scotland and the Orkney Islands will serve.

Meanwhile, in January, Root-Power started the year with a strong foot after winning the planning stamping for the 40MW/80mWh Osgodby Bess, located in Selby, North Yorkshire. Once completed, the project will connect to the supply point of Osgodby -Grast and it will yield a net profit of the biodiversity of 40.72%.

Source link

BESS lands permission planning RootPower
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

UK government considers community grant for battery storage

June 5, 2026

UK CfD scheme provides optimism for the UK investment landscape

June 5, 2026

Fidra Energy buys 1GW BESS from Innova

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

TCL launches Propane Heat Pump for Residential Applications – PV Magazine International

By solarenergyMarch 11, 20250

The Chinese solar manufacturer entered the heat pump business with a new product that is…

Technique Solaire acquires Iberdrola’s French renewable energy unit – SPE

November 25, 2025

Swedish police are investigating the deaths of workers at an electric car battery factory

June 28, 2024

National Grid Renewables begins construction on a 100 MW solar project in Wisconsin

November 15, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Lithuanian grid operators can now shut down solar power plants without cybersecurity measures

June 8, 2026

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Our Picks

Lithuanian grid operators can now shut down solar power plants without cybersecurity measures

June 8, 2026

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.