Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Kona Energy secures £ 40 million capacity market contract
Energy Storage

Kona Energy secures £ 40 million capacity market contract

solarenergyBy solarenergyApril 1, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The two -hour SMeaton Bess received a building permit in September 2024. Image: Scottish Government Energy Complex unit.

Developer Kona Energy has concluded a capacity contract of approximately £ 40 million for his 228 MW/456MWH Battery Energy Storage System (Bess) in East -Lothian, Scotland.

According to Kona, the two -hour SMeaton Bess received a building permit in September 2024 in September 2024 and confirmed its position as one of the most advanced energy storage projects on grid -scale in the UK, according to Kona.

The project has confirmed its capacity market (CM) agreement in the T-4 auction and was one of the only a few awarded that are developed independently. The T-4 auction, which was closed on 11 March, bought a total of 43.1 GW in 669 capacity market units (CMUs).

According to Kona, as well as the CM contract with an index -linked income, the SMeaton Bess now benefits from two ‘protection’ under the current reform of the schedule connection and the Clean Power 2030 plan.

This trust comes if the National Energy System Operator (NESO) has promised to bring projects online prior to their CM delivery year. This suggests that the Smeaton Bess could be operational before 2029.

Moreover, the strategic location of the project in Scotland means that it matches the spatial energy plans that have been developed to adapt to clean energy goals.

There are important transmission restrictions between Scotland and England, with large amounts of wind generation in the first to be transported in the south. As a result, Neso pays wind energy factories to reduce generation or to stop high costs.

Kona notes that the upcoming closure of the Torness nuclear power plant, which will happen in 2028 (when Smeaton could come online), makes the Bess all the more critical for storing and sending surplus renewable energy.

See also  Thrive Renewables lands £ 10 million financing injection

The developer also said that strategic investment discussions are currently underway.

Andy Willis, founder of Kona Energy, said that the market contract of £ 40 million capacity “is the testament of the quality and national interest of the project”.

Willis added: “As we continue to delivery, we are actively involved in selected strategic partners who can bring the right expertise and capital to maximize the potential of the project – we are open to further discussions with third parties that can bring extensive value to deliver this project on ambitious scale that we strive for.”

Source link

capacity contract Energy Kona Market million secures
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026

Peru opens complementary services market to support renewable energy sources – SPE

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Panels

Hoe u een vergunning voor een zonnestelsel kunt krijgen

By solarenergyMay 9, 20240

Voordat u naar de installatie fase van een zonne-energieproject moeten zonne-energieaannemers de noodzakelijke toestemming verkrijgen…

Doe announces $ 8 million to finance Microgrid projects in Alaska, Nevada, South Dakota

June 4, 2025

Installers have misinterpreted what homeowners expect from home batteries – SPE

December 31, 2025

Panasonic launches new air-cooled heat pumps – SPE

November 19, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.