Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Root-Power submits plans for 300 MW of LDES
Energy Storage

Root-Power submits plans for 300 MW of LDES

solarenergyBy solarenergyJune 10, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A 3D Render of the LDES site from Buckinghamshire. Image: Root-Power.

Battery Energy Storage System (BESS) Developer Root-Power today (June 10) announced that the plans has submitted for four energy storage projects in the tender (LDES) from OFGEM.

The four LDEs projects submitted by Root-Power for the Cap and Floor Scheme have a combined 2.4GWH of storage capacity and, if approved, will be built in West Yorkshire, North Yorkshire, Buckinghamshire and Lincolnshire. All four projects will use Vanadium Flow Battery Systems, a technology that is currently relatively unusual in the British Bess sector.

Prior to today’s announcement, Root-Power was almost exclusively involved in delivering 2-hour and 4-hour lithium-ion battery projects, in contrast to the 8-hour durining batteries of the expensive vanadium stream used for the proposed projects.

OFEM’s Cap and Floor Investment Support Scheme for LDES projects launched in April of this year, after an extensive cooperation development process between the Department for Energy Security and Net Zero (Desnz), the National Energy System Operator (NESO) and OFGEM.

The scheme aims to encourage the development of more LDEs projects by balancing the trust of investors and public value for money by determining minimum and maximum income that can be achieved with LDES projects. The first application window for the schedule was closed yesterday (June 9, 2025). To date, most projects that show interest in the schedule, Poes projects of Hydro Energy Storage (Phes) have been pumped instead of storage proposals on battery energy.

Root-Power was launched in July last year as a specialized BESS loopers of the YLEM group, and has since made more than 40 projects progressed by a phase of development. At the end of last month, the developer announced that it had broken the ground on the Dounreay Bess, a 34 MW/68MWH Bess development in a remote coastal area in the Scottish Highlands; The location was specifically chosen to support the “big overhaul” that expects the development of wind energy in the coming years.

See also  Linde invests in blue hydrogen factory in Canada – SPE

Neil Brooks, director of Root-Power, said that the company was dedicated to lead the future of energy storage in the UK. He added: “Our team has been developing these projects carefully for a while and it is fantastic to see the highlight of that work while these projects join our wider portfolio of battery energy storage systems.”

Source link

LDES plans RootPower submits
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

EirGrid identifies a shortage of energy capacity in Ireland

March 5, 2026

China’s 600 MW/2.4 GWh storage facility will be the world’s largest CAES site – SPE

March 4, 2026

Consultancy firm Amber Energy is entering administration

March 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

REC Silicon wants to restart polysilicon shipments in October – SPE

By solarenergySeptember 17, 20240

Norway’s REC Silicon says it has completed construction of the restarted Moses Lake plant and…

Patent Infringement Investigation by Shoals vs. Voltage still running

November 14, 2024

Persistent forest fires in Canada Cross-Continental Solar-PV Magazine International

June 22, 2025

Perovskite-CIGS tandem solar cells have technical potential to reach 26.69% efficiency

July 24, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.