Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Root-Power submits plans for 300 MW of LDES
Energy Storage

Root-Power submits plans for 300 MW of LDES

solarenergyBy solarenergyJune 10, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A 3D Render of the LDES site from Buckinghamshire. Image: Root-Power.

Battery Energy Storage System (BESS) Developer Root-Power today (June 10) announced that the plans has submitted for four energy storage projects in the tender (LDES) from OFGEM.

The four LDEs projects submitted by Root-Power for the Cap and Floor Scheme have a combined 2.4GWH of storage capacity and, if approved, will be built in West Yorkshire, North Yorkshire, Buckinghamshire and Lincolnshire. All four projects will use Vanadium Flow Battery Systems, a technology that is currently relatively unusual in the British Bess sector.

Prior to today’s announcement, Root-Power was almost exclusively involved in delivering 2-hour and 4-hour lithium-ion battery projects, in contrast to the 8-hour durining batteries of the expensive vanadium stream used for the proposed projects.

OFEM’s Cap and Floor Investment Support Scheme for LDES projects launched in April of this year, after an extensive cooperation development process between the Department for Energy Security and Net Zero (Desnz), the National Energy System Operator (NESO) and OFGEM.

The scheme aims to encourage the development of more LDEs projects by balancing the trust of investors and public value for money by determining minimum and maximum income that can be achieved with LDES projects. The first application window for the schedule was closed yesterday (June 9, 2025). To date, most projects that show interest in the schedule, Poes projects of Hydro Energy Storage (Phes) have been pumped instead of storage proposals on battery energy.

Root-Power was launched in July last year as a specialized BESS loopers of the YLEM group, and has since made more than 40 projects progressed by a phase of development. At the end of last month, the developer announced that it had broken the ground on the Dounreay Bess, a 34 MW/68MWH Bess development in a remote coastal area in the Scottish Highlands; The location was specifically chosen to support the “big overhaul” that expects the development of wind energy in the coming years.

See also  Britain is prioritizing electricity grids and storage, and implementation is threatening global goals

Neil Brooks, director of Root-Power, said that the company was dedicated to lead the future of energy storage in the UK. He added: “Our team has been developing these projects carefully for a while and it is fantastic to see the highlight of that work while these projects join our wider portfolio of battery energy storage systems.”

Source link

LDES plans RootPower submits
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026

The government sets targets for 5GW T-1 and 40.9GW T-4

July 27, 2026

Schroders Greencoat, Statkraft updates on UK solar power stations

July 24, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Test error on a 100 MW battery disrupts the power connection between Estonia and Finland – SPE

By solarenergyJanuary 30, 20260

During tests at the 100 MW Kiisa battery farm in Estonia, both EstLink 1 and…

‘Progress is happening, but it remains slow’ – PV Magazine International

September 20, 2025

France reviews off-peak hours to adapt to solar energy generation patterns – SPE

November 7, 2025

Withdrawal of investments in clean energy is a disaster for American energy -dominance

June 10, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.