Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Moldova introduces guarantees of origin for renewable energy sources – PV Magazine International
Technology

Moldova introduces guarantees of origin for renewable energy sources – PV Magazine International

solarenergyBy solarenergyJuly 18, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Moldova has introduced electronic guarantees of the origin system to certify the production of renewable energy, with certificates recognized in the European Union through integration with the EU-wide register.

July 18, 2025
Patrick Jowett

The National Agency for Energy Regulation (Anre) of Moldova has approved the introduction of guarantees of origin certificates for renewable energy sources.

The electronic certification will confirm that a certain volume of energy is produced from renewable sources. It is designed to offer transparency and traceability on the origin of green energy that is supplied to consumers.

Producers of renewable energy will be able to request and receive guarantees of origin for every 1 MWh that is delivered to the schedule. These can be sold to suppliers or directly to consumers, who can use them to show that the energy comes from renewable energy sources.

Anre said it will be responsible for issuing the certificates. The agency noted that it will issue the guarantees within 30 days of receiving a request. The certificates are valid for 12 months from the date of energy production and can be transferred between market participants.

The system will be interconnected with the European Register of Guarrees or Origin, which means that guarantees issued in Moldova can also be recognized in EU member states.

Anre said that the implementation of the system “is an important step towards the initiation of a community market.”

“The new regulations create the required building for producers to obtain extra income, which immediately contributes to the accelerated recovery of investments,” the agency added.

See also  Orgem to assess the allocation of energy costs

The regulation comes into force as soon as it is published in the official Gazette of Moldova.

Moldovia’s Ministry of Energy recently announced that the Introduction to a financial guarantee During the issue of scheduling connection permits for renewable energy sources, were made available 109 MW schedule capacity In the first half of the year.

The first auction of the country of the country, aimed at obtaining 60 MW of Zonne -Zon and 105 MW of Wind, was announced in 2024. In April this year, the Ministry of Energy revealed that the auction was excessreceives a total of 42 bids.

Figures from the International Renewable Energy Agency (Irena) show that Moldova had 344 MW of Cumulative installed solar capacity towards the end of 2024.

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Energy Guarantees International introduces magazine Moldova Origin renewable sources
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Oleic acid anti-pollution coating for solar panels – SPE

March 5, 2026

EirGrid identifies a shortage of energy capacity in Ireland

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

China issues stricter investment rules for the production of PV panels – SPE

By solarenergyNovember 21, 20240

China has tightened investment rules for PV system production and increased the minimum capital ratio…

Reducing the temperature of the PV module with twisted tape

November 17, 2025

Fluence opens Bess housing and BMS -Production -Fabriek in Arizona

May 20, 2025

Philippines secures financing for 125 MW Citicore Solar Project – PV Magazine International

August 14, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.