Greater Manchester football club Avro are looking for a contractor to supply and install a solar and battery storage system.
Available tender details states that the selected contractor will be required to provide a complete turnkey solution consisting of an 80 kW solar panel and a 40 kW battery storage system. The system will be installed at Vestacare Stadium, located in the town of Oldham, home of the football club.
Other responsibilities include full design, engineering and installation services, connection to existing electrical infrastructure and testing, commissioning and handover.
Avro FC says interested contractors must demonstrate relevant experience in commercial solar installations as part of their application. The deadline for submitting bids is set for November 30.
This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.
Popular content
