Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Hungary to host a 450 MW solar power plant using back-contact modules – SPE
Policy

Hungary to host a 450 MW solar power plant using back-contact modules – SPE

solarenergyBy solarenergyDecember 22, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Solarpro says it is building a 450 MW solar power plant in northern Hungary using Longi modules.

December 22, 2025
Brian Public

Solarpro is building a 450 MW solar power plant in Heves County, Hungary. The company said it will be the largest PV installation in the country. The Europe-based engineering, procurement, construction and operations and maintenance contractor is deploying nearly 700,000 solar panels supplied by Chinese manufacturer Longi.

The project is expected to generate approximately 470 GWh of electricity per year, which is sufficient to supply approximately 106,000 households with electricity, according to Solarpro. The companies said the plant could reduce CO2 emissions by about 415,000 tons annually by replacing fossil fuel production.

Solarpro selected Longi’s Hi-MO 9 modules for the project, which use back-contact solar cell technology. The companies said the design places electrical contacts at the back of the cell to improve efficiency, reduce microcracks in silicon wafers and support stable long-term performance under conditions such as heat, dust and variable cloud cover.

The Hungarian project expands an existing partnership between Solarpro and Longi following the completion of a 176 MW solar farm in Romania in 2024. Solarpro said the new development will be the largest back-contact solar installation in Europe.

“It is an honor to supply Solarpro with the modules for this groundbreaking Hungarian project,” said Leon Zhang, president of Longi Europe. “By working together with one of Europe’s leading project developers, we can contribute to the future of clean energy in the region while setting a new technological standard.”

See also  'Closing the gender gap is not only an ethical, but also a strategic imperative' – SPE

Krasen Mateev, CEO of Solarpro, said the development in Hungary represents an important project for the company and will become Europe’s largest back-contact solar installation, marking an important step in Solarpro’s efforts to deliver reliable, high-efficiency clean energy across the region.

Last week, France-based startup Carbon unveiled plans to partner with China’s Longi Green Energy Technology to adopt back-contact solar technology as it reviews plans for a gigawatt-scale module factory in France, moving away from in-house development of tunnel oxide passivated contact (TOPCon). The shift includes a 700MW pilot assembly plant in southern France to test industrial processes and supply chains while developers sign future supply agreements and wait for clearer government rules on the suitability of European solar energy.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

backcontact host Hungary modules plant power solar SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Fronius introduces external configuration skills for Gen24 -Omvolers

By solarenergyJuly 2, 20250

Fronius USA The release of the external configuration and configuration report functions announced, using the…

Envertech launches microinverters for PV systems with up to 60 modules – SPE

September 16, 2024

The FIT program continues to encourage small-scale solar installations in the UK

December 15, 2025

Root-Power land planning permit for 50MW BESS

December 6, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.