Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Commercial & Industrial - 150 MW battery energy storage system approved in Northern Ireland
Commercial & Industrial

150 MW battery energy storage system approved in Northern Ireland

solarenergyBy solarenergyFebruary 17, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

A 150MW/300MWh battery energy storage system (BESS) has been approved for development in County Antrim, Northern Ireland.

The project was proposed in July 2025 by Northern Ireland developer Valor Power.

A LinkedIn message by Donna Lyle, deputy director of planning consultancy Turley Belfast, states that planning permission was granted by Antrim and Newtonabbot Borough Council at a meeting on the evening of February 16. The planning portal has not yet been updated to reflect this.

According to Lyle’s post, the project will “play a key role in supporting the SONI-identified Kells Grid Cluster, helping to strengthen grid stability, enable greater integration of renewables and support the continued decarbonization of the electricity system.”

Located off Lisnunnan Road in Kells, the 2-hour BESS is 800 meters south of the Kells substation and will support planned renewable generation in the Kells Grid Cluster, which Northern Ireland grid operator SONI planned to enable multiple grid connections with minimal visual impact.

Related:UK BESS financing space is evolving, but toll offering remains shallow

Valor Power’s facility will have 30 battery units, each consisting of two containers and a Power Conversion System (PCS), delivering approximately 5MW/10MWh per unit. Construction also includes a 110 kV substation and a control room (which will see rooftop PV panels installed, according to the application).

There were relatively many social objections to the project: 37 of the 40 responses to the plan proposal were objections (and one was without obligation).

A response from Dunsilly councilor Stewart Wilson suggests the BESS would pose a threat to public safety, citing fire risk, and also notes the visual impact of the project and its impact on local character.

See also  REC leads American residential solar panels while Tesla loses storage share - PV Magazine International

Antrim and Newtonabbot Council’s planning committee has previously approved two BESS sites in the area, with one 100MW site approved in August 2025 and a 79MW facility approved in October 2025.

The Environmental Impact Assessment (EIA) report states that Valor’s proposed development is not close enough to those other sites to have a cumulative impact.

It also notes that there is scope for the development to be visually prominent, but that ultimately it is considered ‘unlikely that the proposal will have unacceptable impacts on interests of recognized importance, subject to best practice and established mitigation techniques’.



Source link

approved battery Energy Ireland Northern storage system
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Türkiye will add 2.1 GW of solar energy in the first half of the year

July 30, 2026

The Trinity Energy project takes the Florida Costco distribution center off-grid

July 29, 2026

Georgia Power cuts the ribbon on the Moody Battery Facility

July 29, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Recurrent Energy’s Middle Road project sold to Centrica

By solarenergyJune 1, 20240

The Pantymoch site in Port Talbot, Wales, is another part of Recurrent Energy’s growing UK…

Energy Storage Association Lanced to Back UK Storage Market

June 27, 2025

Fraunhofer Institutes developing electrocaloric Solid-State heat pump without compressor-PV Magazine International

February 22, 2025

IFC -Loingen $ 250 million for Oman Polysilicon Project – PV Magazine International

August 11, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.