Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Ontario supports 12 solar projects totaling 915 MW – SPE
Policy

Ontario supports 12 solar projects totaling 915 MW – SPE

solarenergyBy solarenergyApril 13, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Canadian province of Ontario has shared the results of what it has called the largest public energy tender in its history, offering contracts for twelve solar energy projects and two wind energy projects with a cumulative capacity of more than 1.3 GW.

April 10, 2026
Patrick Jowett

Toronto, Ont

Image: Mwangi Gatheca/Unsplash

Ontario’s Independent Electricity System Operator (IESO) has approved 12 solar projects with a combined capacity of 915.1 MW through the province’s Long-Term 2 (LT2) Energy Window 1 procurement round.

It has also agreed on two new wind energy projects totaling 400 MW, marking the first major competitive procurement of new wind and solar energy resources in the Canadian province in more than a decade.

The 14 projects together represent more than 1.3 GW of new capacity. Together, they plan to add more than 3 TWh of new annual capacity to Ontario’s grid, which is enough power to power more than 350,000 homes in the province.

Each of the projects includes at least 50% indigenous equity ownership. The approved solar projects range from 9 MW to 200 MW in capacity and include four projects with a size of more than 100 MW.

The results of the bidding period lists the largest solar projects as the 200 MW Dunns Valley Solar site, the 167.2 MW CarbonFree Fort Frances project, the 154 MW CarbonFree Kynoch project and the 141.25 MW Massey Solar project.

Details on IESO’s website state that the company is currently in the process of executing contracts with the selected proponents and will publish associated prices once the contracts are fully executed, which is expected to be in May.

See also  Environmental groups are calling for an end to Trump's federal ban on clean energy projects

The LT2 tender was first announced in 2024. The selected projects will have a 20-year agreement and are expected to begin commercial operation in early May 2030.

Vittoria Bellissimo, president and CEO of the Canadian Renewable Energy Association (CanREA), noted that the procurement results are a clear signal that renewable energy is ready to meet the challenge of rapid growth.

In February, CanREA said pv magazine Canada’s cumulative solar capacity could rise to 21 GW by the middle of the next decade, up from the current 5.4 GW, largely due to upcoming utility-scale procurement. The association added that nine of Canada’s provinces are hosting future calls.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Ontario projects solar SPE supports totaling
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

Bangladesh opens public land to utility-scale solar energy under PPP model – SPE

By solarenergyApril 22, 20260

Bangladesh has introduced a new regulatory framework to develop utility-scale solar projects on land owned…

US energy storage installations to surpass 2024 total in third quarter of 2025 – SPE

December 18, 2025

Trina Solar achieves new milestones for tandem efficiency and module power – SPE

December 24, 2025

What Are Examples of Renewable Energy and Alternative Energy 2024

May 16, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026

Zendure launches battery ranges for residential PV – SPE

April 23, 2026
Our Picks

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.