Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Boot Hill Solar comes online in western Kansas

June 17, 2026

DESNZ opens consultations for the deployment of plug-in solar energy

June 17, 2026

Frontier acquires zinc LDES projects in Scotland from Apatura

June 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Wednesday, June 17
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Frontier acquires zinc LDES projects in Scotland from Apatura
Energy Storage

Frontier acquires zinc LDES projects in Scotland from Apatura

solarenergyBy solarenergyJune 17, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

UK-based Frontier Power has acquired two long-term energy storage projects (LDES) currently under development in Scotland from Apatura Energy.

The projects are the 200 MW/1,600 MWh Ayr battery energy storage system (BESS) and the 150 MW/1,200 MWh Busby BESS, located in Ayrshire and East Renfrewshire respectively. The projects will use the Z3 technology platform developed by New Jersey-based Eos Energy Enterprises, which develops hybrid zinc cathode batteries.

While the company reported back-to-back quarters of losses in its most recent financial results, CEO Joe Mastrangelo described the 2025 financial results as a “structural turning point” ahead of his work going forward. Eos signed other agreements with Frontier Power for a 5GWh portfolio in the UKnext to a 2GWh portfolio with its US subsidiaryand Mastrangelo was optimistic about the company’s partnership with Frontier in Britain.

Related:Battery energy storage a ‘keystone investment’ in a ‘modern, efficient energy system’

“The choice of Eos Z3 technology for projects such as Ayr and Busby reflects the growing recognition of long-term energy storage as a crucial part of modern grid infrastructure,” he said. “As customers seek solutions that improve grid reliability and energy security, we believe Eos is uniquely positioned to meet these needs with a secure, scalable and purpose-built technology.”

Apatura said it will “continue to play an active role” in the development of the projects alongside Frontier until they become commercially operational, although the companies did not provide a date for the start of commercial operations for either project.

However, they noted that both projects had received “Gate 2 notifications” under the National Energy System Operator’s (NESO) reformed grid connection process. Last week, NESO confirmed firm connection offers for 37 GW of new electricity generation capacitywhich will come online by the end of the decade.

See also  EU supports 15 hydrogen projects - PV Magazine International

Frontier also noted that it intends for the Ayr and Busby projects to participate in Ofgem’s LDES cap and floor scheme, and the company received awards for 16 vanadium flow batteries and zinc batteries in the program’s first award September 2025.



Source link

Acquires Apatura Frontier LDES projects Scotland zinc
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Energy storage a ‘keystone investment’ for the energy system

June 17, 2026

WRU activates solar panels with 3,300 panels at the Principality Stadium

June 16, 2026

Australia’s Allume Energy is bringing an updated shared solar offering to Britain

June 16, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Stellar unveils 2 GW scale solar ingot and wafer manufacturing plant

By solarenergyJanuary 14, 20260

Plans to establish Australia’s first commercial-scale solar block and wafer manufacturing plant near Townsville in…

Solar PV accounted for 29% of electricity generation in Chile in March, with immediate peaks reaching 75% – SPE

May 10, 2026

Edilians launches tile-like mounting system for solar energy on the roof

March 27, 2025

New home battery from Kora comes with Smart Panel and VPP platform

September 14, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Boot Hill Solar comes online in western Kansas

June 17, 2026

DESNZ opens consultations for the deployment of plug-in solar energy

June 17, 2026

Frontier acquires zinc LDES projects in Scotland from Apatura

June 17, 2026

India has curtailed 2.1 TWh of renewable electricity in the 2025-2026 financial year

June 17, 2026
Our Picks

Boot Hill Solar comes online in western Kansas

June 17, 2026

DESNZ opens consultations for the deployment of plug-in solar energy

June 17, 2026

Frontier acquires zinc LDES projects in Scotland from Apatura

June 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.