Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - PV installation based on 5B’s modular solar technology goes online in Australia
Solar Industry

PV installation based on 5B’s modular solar technology goes online in Australia

solarenergyBy solarenergyMay 8, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

A 4.4 MW solar project with 5B modular PV technology has started in Australia. The project includes 2 MW/1 MWh battery storage systems from British supplier Aggreko.

May 8, 2024 pv magazine

Aggreko, a UK specialist in mobile energy solutions, has commissioned a new 4.4 MW solar project to supply renewable energy to Northern Star Resources’ Porphyry gold mine in Australia, under a long-term agreement for the purchase of energy (PPA).

The Porphyry project features Australian modular solar manufacturer 5B’s deployable Maverick technology and two Aggreko Y.Cube battery energy storage systems totaling 2 MW/1 MWh.

The Maverick system is a ground-mounted solar array of up to 90 PV panels, mounted on specially designed frames that can be quickly deployed and installed. The modules are oriented in an accordion shape with a 10-degree slope and are electrically configured for quick installation.

The project in Kalgoorlie, Western Australia, is integrated with a 5 MW diesel power plant owned by Aggreko. The combined project is the company’s second thermally renewable hybrid power plant in the region.

Under the long-term PPA, the project will run for a maximum of 20 years. George Whyte, Aggreko’s Managing Director for the Asia Pacific region, said the business was commissioned in February 2024. The project will ensure long-term sustainable energy supply as part of Northern Star Resources’ Carosue Dam operations in Western Australia.

Carosue Dam Operations General Manager John Albrecht said the PV array will provide a “cost-effective solution that can be scaled up and down as needed throughout the operational life cycle of our mine.” Carosue Dam Operations includes the Carosue Dam Project, the Porphyry Project and the Deep South Project, which are primarily located in Western Australia.

See also  Monolithic perovskite-organic tandem solar cell achieves an efficiency of 24.27%

Author: Tamsin Paternoster

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Source link

5Bs Australia based Installation modular Online solar technology
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Pennsylvania passes law establishing solar decommissioning plans

July 21, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Grant launches air-to-water heat pump for residential applications – SPE

By solarenergySeptember 20, 20240

The new propane heat pump has a coefficient of performance of up to 4.9 and…

Virginia Report shows that 16% of the Resi -Zonne projects that start with the allowance of process are specified

October 2, 2025

First Oxford PV perovskite solar panels sold to US utility project

September 6, 2024

American researchers link H2 Impact to production – PV Magazine International

February 28, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.