Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - National Grid is re-examining energy storage rating factors
Energy Storage

National Grid is re-examining energy storage rating factors

solarenergyBy solarenergyMay 22, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
Zenobe said a specific battery storage rating downgrade method for the capacity market should be introduced. Image: Zenobe.

National Grid ESO is reviewing the methodology used to calculate energy storage derating factors, with project managers saying they currently undervalue the technology.

Increasingly, British capacity market auctions have signed contracts for the purchase of reserve energy capacity from energy storage. The amount paid for a resource depends on its reliability: how well the resource will provide standby capacity.

The ESO is reassessing the way it determines how much surcharge is paid on the capacity market, the so-called ‘derating factor’. The derating factor is the percentage of the total auction rate that a technology type receives.

Chris Wickins, technical director of developer-operator Field, told our sister store Energy storage.news: “National Grid is looking at the derating factors for energy storage in the capacity market and has proposed increasing these in future auctions.

“This is because, after taking a closer look at the energy storage purchased to date, they have realized that the assets as a whole are more useful than current derating factors would imply.”

He added that moving to a central shipping system would improve the usefulness of the storage. In the current self-dispatch system, operators are responsible for their dispatch in response to stress event notifications; The change would see ESO or an equivalent company control the entire fleet of energy storage resources.

Six years since the last methodology update

National Grid ESO periodically reviews model assumptions and methods in response to market developments; the current working method was introduced in 2018.

As things stand now, the derating factor for energy storage depends on its duration: 0.5-hour systems receive roughly 4-5% of the rate, with a phased increase to around 90% for 8-hour systems hours or more.

See also  Midsummer, Kaisheng partner in thin-film solar energy production

Battery energy storage is a relatively new technology, having been widely introduced after the initial derating methodology was first established in 2014. As such, a battery storage-specific method may be necessary, according to developer-operator Zenobe.

One problem arises because operators can bid with a longer duration than their project actually has, by bidding with a lower MW power capacity than their rated output.

The full article on derating factors with commentary from Field, Zenobe, Balance Power and National Grid ESO is available with Premium access to Energy-Storage.new.

Source link

Energy Factors grid national rating reexamining storage
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Runergy urges US authorities to revoke two TOPCon patents of Trina Solar

By solarenergyOctober 10, 20240

Runergy is urging the United States Patent and Trademark Office (USPTO) to cancel Trina Solar’s…

US government doubles tariffs on imports of PV cells from China to 50%

May 15, 2024

Payment plans are essential for solar water pumping in Sub-Saharan Africa – SPE

May 9, 2024

Backsheet Bode PV manufacturers

February 20, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.