Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Affordable wire management approved for use with Sungrow’s 4.4 MW inverter
News

Affordable wire management approved for use with Sungrow’s 4.4 MW inverter

solarenergyBy solarenergyMay 27, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Affordable Wire Management (AWM) announced that the company has achieved a 630A rating Renewable Energy Test Center (RETC), a Nationally Recognized Testing Laboratory (NRTL). AWM’s CMS is the first in the industry to achieve this rating, making their offering eligible to support Sungrow’s recently released 4.4 MW SG4400UD-MV modular inverter in North America.

“Sungrow’s 4.4 MW inverter breaks new ground for more efficient and cost-effective utility-scale solar design. By installing our inverters, developers can reduce overall LCOE by requiring fewer inverters per megawatt. Thanks to AWM’s innovations, the higher demands are managed safely, as their all-metal CMS are bonded and have a capacity of up to 630 amps. It is exciting to see that AWM is already producing offerings for the North American market that are ready to support Sungrow’s latest push into inverter technology,” said Mikhail (Naveed) Hasan, Sungrow’s VP of strategy and marketing.

AWM solutions meet IEEE and NEC requirements for bonding excess bare metal that is likely to be stressed. They are also rated to comply UL2703, the standard for mounting systems, mounting devices, clamping/retaining devices and grounding cable lugs for use with flat photovoltaic modules and panels.

Other alternatives, including polymetric (plastic) hangers, circumvent this important standard because they do not have a metal-to-metal bond.

The RETC has rated AWM’s CMS, including the pendants, above the maximum amperage of 200 A, defined by UL2703, to achieve a connection value of 630 A. This meets the overcurrent capacity of Sungrow’s latest inverters for utility-scale solar projects, with the increased fuse capacity of 630 A.

See also  The new Lumin smart panel adds energy management capabilities

“Utility-scale wire management carries and routes dozens of electrical cables for up to 40 years, so selecting the right eBOS components is critical to the long-term reliability of power plants. O+M teams, owners and operators are already learning the hard way that plastic will break down over the 40+ year lifespan of a project. Plant owners are inevitably forced to invest time and money in replacing them – an unfortunate, inefficient and costly outcome of using plastic,” said Scott Rand, co-founder and CEO of AWM. “By offering all-metal solutions, AWM’s offering supports the most advanced technological developments and designs in the large-scale solar sector. The developers, EPCs and EORs we work with, as well as owner/operators, all experience the very real benefits of lower construction costs, improved safety, consistent power plant performance and longer life.”

AWM’s comprehensive CMS is designed for utility-scale solar projects and includes the Arden Messenger cable hanger, the Bonsai Module Cable Hangerand the Solar LOTOTO lockout solution. Announced in early 2024, AWM’s expanded hardware offering includes the HELIOS Beam Rod and the PHOTON Toolkit.

News item from Affordable Wire Management

Source link

affordable approved inverter management Sungrows wire
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Until UK Solar Acquisition sites unveiled

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Commercial & Industrial

British Gas partnership to enable rural solar energy

By solarenergyApril 25, 20240

The partnership means that British Gas can install solar and battery technology for eligible customers…

Number of applications for solar energy in the Dutch subsidy scheme has fallen by more than half – SPE

December 19, 2024

The National Black -Out of Spain leaves millions in the dark, cause still unclear – PV Magazine International

April 30, 2025

UP: Steely determination

December 31, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.