Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Amea Power activates 26.6 MW solar park in Burkina Faso – SPE
Policy

Amea Power activates 26.6 MW solar park in Burkina Faso – SPE

solarenergyBy solarenergyJune 2, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Amea Power has connected the Zina solar power plant to the electricity grid in Burkina Faso, to power the Mana gold mine in Mouhoun province.

May 31, 2024 Marie Beijer

Dubai-based Amea Power has announced the commissioning of the Zina solar power plant in Mouhoun Province, Burkina Faso.

The 26.6 MW facility will be operated under a 25-year electricity purchase contract with the country’s national electricity company, Sonabel.

The project was started in 2009 as part of a public-private partnership between the government of Burkina Faso and the Canadian mining company Semafo, with the aim of supplying electricity to the Mana gold mine. In 2013, the project company separated from Semafo to become Windiga Énergie Burkina – it still owns 5% of the assets today.

The construction contract was originally entrusted to the French developer Bouygues Energies & Services, which was also responsible for the operation and maintenance of the plant. However, at a later stage, Amea Power acquired 90% of the project capital from Windiga and hired a new engineering, procurement and construction contractor, China-based Sinohydro. The project also included the construction of a 90 kV transmission line between the towns of Pâ and Mana.

The construction of the factory was financed by International Finance Corp. (IFC), the IFC-Canada Climate Change Program and the Emerging Africa Infrastructure Fund.

Burkina Faso plans to add approximately 500 MW of renewable capacity by 2025. In December 2023, the government inaugurated two solar power plants in Kôdéni and Pâ with a combined capacity of 68 MW.

See also  China extends anti-dumping duties on solar silicon from the US and South Korea

According to the International Renewable Energy Agency (IRENA), the country had an installed PV capacity of 177 MW.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Source link

activates Amea Burkina Faso park power solar SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Jackery, Geneverse present new energy storage system for homes – SPE

By solarenergySeptember 12, 20240

The two US-based companies will showcase their new home energy system with up to 123.2…

Korean researchers build back-contact perovskite solar cells with lower recombination losses – SPE

March 5, 2026

Micro-islands of copper, indium and selenium pave the way for the next generation of micro-concentrator solar cells

April 3, 2026

Wavelength-selective PV technology for agrivoltaic applications

November 13, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.