Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - India launches tender for 2 GW solar energy storage – SPE
Policy

India launches tender for 2 GW solar energy storage – SPE

solarenergyBy solarenergyAugust 4, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Solar Energy Corp. of India (SECI) is accepting bids to set up 2 GW of solar PV projects with 1 GW/4 GWh energy storage systems on a build-own-exploit basis. The projects can be implemented anywhere in India and must be connected to the inter-state transmission system.

August 2, 2024 Uma Gupta

By pv magazine India

Solar Energy Corp. of India (SECI) has invited bids for setting up 2 GW of solar PV projects with energy storage systems (ESS) in India. The projects must be developed on a build-own-operate basis. These can be located anywhere in India and must be connected to the inter-state transmission system.

SECI will enter into a Power Purchase Agreement (PPA) with the successful bidders for a period of 25 years. The power obtained by SECI from the projects is intended for sale to the various purchasing entities in India

As part of the project, an ESS of at least 0.5 MW/2 MWh capacity for 1 MW solar project capacity must be installed. ESS charged from a source other than solar energy does not qualify as solar energy. ESS can be owned by the developer or separately connected to a third party for power supply. The ESS technology may be changed by the developer at any time during the term of the PPA.

A developer must submit one bid for a minimum of 50 MW of contracted capacity and a maximum of 1,000 MW, in multiples of 10 MW.

“Bidders who have already commissioned solar PV projects or are in the process of constructing such projects and have uncommitted capacity can also participate. In such case, they will get the benefit of a longer period of PPA, proportionate to the length of time between the actual date of commencement of power supply and the planned date of commencement of supply,” the tender document said.

See also  Malaysian plan allows companies to buy renewable energy on the grid from developers – SPE

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Energy India launches solar SPE storage tender
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Letter from Chinese PV Industry: Aiko, Skyworth PV plan 5 GW back-contact solar panel factory in Guangxi

By solarenergyDecember 5, 20250

The two companies will invest approximately CNY 2 billion ($282.8 million) in the new facility,…

Scientists build 29.5%efficiency All-Perovskite tandem solar cells by universal interfacial engineering

June 11, 2025

Sunrun’s solar and storage VPP supports California’s grid with 48 MW per night during heat waves

July 20, 2024

Drax buys three BESS projects for £157 million

October 30, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.