Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - India launches tender for 2 GW solar energy storage – SPE
Policy

India launches tender for 2 GW solar energy storage – SPE

solarenergyBy solarenergyAugust 4, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Solar Energy Corp. of India (SECI) is accepting bids to set up 2 GW of solar PV projects with 1 GW/4 GWh energy storage systems on a build-own-exploit basis. The projects can be implemented anywhere in India and must be connected to the inter-state transmission system.

August 2, 2024 Uma Gupta

By pv magazine India

Solar Energy Corp. of India (SECI) has invited bids for setting up 2 GW of solar PV projects with energy storage systems (ESS) in India. The projects must be developed on a build-own-operate basis. These can be located anywhere in India and must be connected to the inter-state transmission system.

SECI will enter into a Power Purchase Agreement (PPA) with the successful bidders for a period of 25 years. The power obtained by SECI from the projects is intended for sale to the various purchasing entities in India

As part of the project, an ESS of at least 0.5 MW/2 MWh capacity for 1 MW solar project capacity must be installed. ESS charged from a source other than solar energy does not qualify as solar energy. ESS can be owned by the developer or separately connected to a third party for power supply. The ESS technology may be changed by the developer at any time during the term of the PPA.

A developer must submit one bid for a minimum of 50 MW of contracted capacity and a maximum of 1,000 MW, in multiples of 10 MW.

“Bidders who have already commissioned solar PV projects or are in the process of constructing such projects and have uncommitted capacity can also participate. In such case, they will get the benefit of a longer period of PPA, proportionate to the length of time between the actual date of commencement of power supply and the planned date of commencement of supply,” the tender document said.

See also  Greece announces downsized auction for battery storage in coal regions – SPE

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Energy India launches solar SPE storage tender
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

How to influence Trump’s widespread rates

By solarenergyApril 4, 20250

By PV Magazine USA From 5 April, the Trump administration has adopted the rates that…

Powering the Metaverse with Renewable Energy (2025)

June 4, 2025

Standalone liquid air energy storage system for power, heating and cooling supply – SPE

November 27, 2024

Energizer Solar products are distributed through ATG E Power

June 24, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025
Our Picks

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.