Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - India launches tender for 2 GW solar energy storage – SPE
Policy

India launches tender for 2 GW solar energy storage – SPE

solarenergyBy solarenergyAugust 4, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Solar Energy Corp. of India (SECI) is accepting bids to set up 2 GW of solar PV projects with 1 GW/4 GWh energy storage systems on a build-own-exploit basis. The projects can be implemented anywhere in India and must be connected to the inter-state transmission system.

August 2, 2024 Uma Gupta

By pv magazine India

Solar Energy Corp. of India (SECI) has invited bids for setting up 2 GW of solar PV projects with energy storage systems (ESS) in India. The projects must be developed on a build-own-operate basis. These can be located anywhere in India and must be connected to the inter-state transmission system.

SECI will enter into a Power Purchase Agreement (PPA) with the successful bidders for a period of 25 years. The power obtained by SECI from the projects is intended for sale to the various purchasing entities in India

As part of the project, an ESS of at least 0.5 MW/2 MWh capacity for 1 MW solar project capacity must be installed. ESS charged from a source other than solar energy does not qualify as solar energy. ESS can be owned by the developer or separately connected to a third party for power supply. The ESS technology may be changed by the developer at any time during the term of the PPA.

A developer must submit one bid for a minimum of 50 MW of contracted capacity and a maximum of 1,000 MW, in multiples of 10 MW.

“Bidders who have already commissioned solar PV projects or are in the process of constructing such projects and have uncommitted capacity can also participate. In such case, they will get the benefit of a longer period of PPA, proportionate to the length of time between the actual date of commencement of power supply and the planned date of commencement of supply,” the tender document said.

See also  China to switch from attacks to market-oriented prize for renewable energy sources-PV Magazine International

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Energy India launches solar SPE storage tender
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

Hungary adds 1.4 GW Solar in 2024 – PV Magazine International

By solarenergyApril 5, 20250

Utility scale Zonne-Zon was good for about half of the new solar energy in Hungary…

Coral Reef Partners completes a 2 MW solar project in central Pennsylvania

October 29, 2025

Solareit buys land for an installation of 39 MW in PA.

February 17, 2025

The largest battery storage system in France is being tackled – PV Magazine International

August 23, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.