Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Wärtsilä upgrades autonomous software for GWh-scale BESS in Australia – SPE
Policy

Wärtsilä upgrades autonomous software for GWh-scale BESS in Australia – SPE

solarenergyBy solarenergyAugust 14, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Finland-based Wärtsilä Energy has upgraded its GEMS digital energy platform to transform the way GWh-scale battery energy storage (BESS) projects are managed in Australia.

August 14, 2024 Ev Foley

By pv magazine Australia

Wärtsilä Energy has launched an upgrade of its GEMS software product. It claimed this will change the way GWh-scale BESS is managed in Australia.

The GEMS digital energy platform connects energy assets to markets and monitors, controls and optimizes assets at both site and portfolio levels, with the new iteration, GEMS 7, operating autonomously to support multi-GWh scale energy storage projects.

In Australia, Wärtsilä uses the GEMS management system at project sites it has built, including South Australian AGL Energy Torrens Island 250 MW/250 MWh BESS, and in New South Wales Origin Energy’s Eraring Power Station, Stage 1 BESS (460 MW /920 MWh). MWh) and Phase 2 BESS (240 MW/1,030 MWh).

Like previous versions, GEMS 7 provides a single, unified platform on which factory owners can control and monitor project hardware, including BESS, renewable and thermal generation assets, as well as the entire balance of factory assets.

The new version allows users to quickly and easily comply with dynamic utility and market regulations while adapting to renewable energy sources.

Ruchira Shah, Managing Director of Wärtsilä Software Product Management, said pv magazine that the technology is well suited to the specific challenges of the Australian energy market and matches the country’s 32 GW of renewables by 2030. It also includes extensive alarm functions and algorithms to enable cell balancing and state of charge calibration.

See also  Battery fire shuts down California highway – SPE

“There are numerous benefits to the GEMS 7 update,” Shah said. “Not only are we making this possible now large-scale projectsbut we also enable a more intuitive visualization of those projects… For small projects it is easy to visualize a site on one screen because there may be only a few inverters and battery units. For a large project, you need the ability to zoom in and out on different parts of your factory. GEMS 7 makes this possible.”

Shah said the desire and need to continually update the GEMS platform to meet customer needs has been a driver for the latest version.

“Two of the biggest trends we are seeing from customers are a move toward larger BESS sizes and increasing complexity in grid code requirements and a desire for batteries to provide advanced functionality such as synthetic inertia, black start and scheduling,” said Shah. “Our GEMS 7 update is intended to support customers as they transition to larger BESS sizes, while maintaining our solid architectural platform that allows customers to quickly meet dynamic market requirements.”

Key features of GEMS 7 include the ability to monitor multi-GWh scale BESS facilities in a fraction of a second, while providing asset visibility at the battery cell level using more comprehensive visualizations for the management of large locations.

GEMS 7 provides the ability to limit remote site monitoring, reduce latency for rapid response events (critical in Australia) and provide continuous data access at the module level. The platform also features site partitioning to allocate different revenue streams.

“Overall, GEMS benefits customers by providing a platform that is easily adaptable to new markets and new grid code requirements, meaning that when a new market becomes available, customers can quickly enter that market if it is lucrative,” said Shah. “Another advantage of our platform is that we store data at module level. This allows us to see operational issues that may be going unnoticed or missing from that data.”

See also  EU to install 27.1 GWh of battery storage by 2025 as utility-scale leader – SPE
Image: Wärtsilä Energie

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Australia autonomous BESS GWhscale software SPE upgrades Wärtsilä
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

Oleic acid anti-pollution coating for solar panels – SPE

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Berkeley Lab finds that community solar reaches targeted underserved subscribers

By solarenergyJune 8, 20240

A 3 MW community solar project in Morris, Illinois. Summit Ridge Energy By the end…

Discovery of green batteries turns waste into treasure

January 11, 2025

Photovoltaic concentrator module based on surface-mounted technology

June 11, 2024

Schroders Greencoat acquires a 49.9 MW Tiln Farm solar project

August 28, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.